WindOperatingPJM

Big Sky Wind LLC

Wind power plant in Bureau County, Illinois. 239.4 MW of nameplate capacity across 1 generator, operated by Big Sky Wind LLC.

Also known as Big Sky Wind · EIA plant 57135

Analyst: free account, 1 question a day.

SV CSG Paloma SolarOhio Solar LLCWalnut Ridge Wind FarmBureau Solar 1Com Adam 1WF-1Big Sky Wind10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
239.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
February 2011First generator online
Operator
Big Sky Wind LLCEIA operator ID 64499
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Bureau County, IL41.5992, −89.4561
EIA plant ID
57135EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Big Sky Wind produces

Free · EIA-923

Net generation, 2025

817 GWh

816,633 MWh, final

Capacity factor, 2025

38.9%

2024: 34.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

309.4–816.6

GWh a year. Low 2021, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011469,427Not reported11 of 12
2012491,57023.3%12 of 12
2013529,70925.2%12 of 12
2014537,02125.5%12 of 12
2015530,59125.2%12 of 12
2016522,33324.8%12 of 12
2017575,91727.4%12 of 12
2018499,26023.7%12 of 12
2019527,26925.1%12 of 12
2020432,529Not reported12 of 12
2021309,39214.8%12 of 12
2022462,29622.0%12 of 12
2023674,71632.2%12 of 12
2024730,88934.8%12 of 12
2025816,63338.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine239.4February 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Big Sky Wind LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Big Sky Wind LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Big Sky Wind

Questions about Big Sky Wind

How much power does Big Sky Wind LLC produce?

Big Sky Wind LLC reported 816,633 MWh (817 GWh) of net generation in 2025, a 38.9% capacity factor on 239.4 MW of nameplate capacity.

Where is Big Sky Wind LLC?

Big Sky Wind LLC is in Bureau County, Illinois, at 41.5992, −89.4561. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Big Sky Wind LLC?

EIA-860M for August 2026 lists Big Sky Wind LLC as the operator (EIA operator ID 64499). The operator is not always the owner.

When did Big Sky Wind LLC start operating?

Its first generator began operating in February 2011, according to EIA-860M.

Does InfraMap have power prices for Big Sky Wind LLC?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Big Sky Wind LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page