Natural gasBattery storageOperating

Soldotna

Natural gas and battery storage project in Kenai Peninsula, Alaska. 96.5 MW of nameplate capacity across 2 generators, operated by Homer Electric Assn Inc.

Also known as Soldotna Combustion Turbine Plant · EIA plant 57206

This project groups Soldotna (EIA 57206). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Nikiski Combined CycleBernice LakeSoldotna10 km
Open in the map
3 plants within 30 km, from EIA coordinates.

Key facts

Capacity
96.5 MWNatural gas 50.0 · Battery storage 46.5
Generators
2 operatingEIA-860M, August 2026
Operating since
April 2014First generator online
Operator
Homer Electric Assn IncEIA operator ID 19558
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
Kenai Peninsula, AK60.4994, −150.9972
EIA plant ID
57206EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Soldotna produces

Free · EIA-923

Net generation, 2025

20.0 GWh

20,035 MWh, final

Capacity factor, 2025

4.8%

2024: 9.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

16.6–46.5

GWh a year. Low 2022, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
201446,48114.1%9 of 12
201541,0879.4%12 of 12
201639,6129.0%12 of 12
201718,1664.1%12 of 12
201823,7565.4%12 of 12
201946,49910.6%12 of 12
202035,2598.0%12 of 12
202133,1217.6%12 of 12
202216,561Not reported12 of 12
202321,6145.2%12 of 12
202442,1059.8%12 of 12
202520,0354.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine50.0April 2014
3Batteries46.5January 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Homer Electric Assn Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Soldotna and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Soldotna

More plants operated by Homer Electric Assn Inc

Questions about Soldotna

How much power does Soldotna produce?

Soldotna reported 20,035 MWh (20.0 GWh) of net generation in 2025, a 4.8% capacity factor on 96.5 MW of nameplate capacity.

Where is Soldotna?

Soldotna is in Kenai Peninsula, Alaska, at 60.4994, −150.9972.

Who operates Soldotna?

EIA-860M for August 2026 lists Homer Electric Assn Inc as the operator (EIA operator ID 19558). The operator is not always the owner.

Is Soldotna a natural gas or a battery storage plant?

Both. Natural gas capacity totals 50 MW and battery storage capacity totals 46.5 MW.

When did Soldotna start operating?

Its first generator began operating in April 2014, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page