WindOperatingISO-NE

MA Military Reservation Wind Project

Wind power plant in Barnstable County, Massachusetts. 4.5 MW of nameplate capacity across 3 generators, operated by Air Force Civil Engineer Center.

Also known as AFCEE MMR Turbines · Air Force (Barnstable) · EIA plant 57253

Analyst: free account, 1 question a day.

Green MeadowsFalmouth 2 SolarNotus Wind 1Blacksmith Road Solar 1118 EchoMA Military Reservati…2 km
Open in the map
6 plants within 7.6 km, from EIA coordinates.

Key facts

Capacity
4.5 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 2009First generator online
Operator
Air Force Civil Engineer CenterEIA operator ID 56619
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
Barnstable County, MA41.6647, −70.5942
EIA plant ID
57253EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power MA Military Reservation Wind Project produces

Free · EIA-923

Net generation, 2025

5.06 GWh

5,057 MWh, final

Capacity factor, 2025

12.8%

2024: 24.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

5.1–10.6

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009212Not reported12 of 12
20102,08315.9%12 of 12
20112,973Not reported12 of 12
201210,40126.3%12 of 12
201310,19325.9%12 of 12
20148,45821.5%12 of 12
20158,11420.6%12 of 12
20168,77422.2%12 of 12
201710,56726.8%12 of 12
201810,32226.2%12 of 12
20199,65324.5%12 of 12
20209,20323.3%12 of 12
20217,83119.9%12 of 12
20229,53824.2%12 of 12
20239,68724.6%12 of 12
20249,69324.5%12 of 12
20255,05712.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine1.5December 2009
2Onshore Wind Turbine1.5November 2011
3Onshore Wind Turbine1.5November 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Air Force Civil Engineer Center as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query MA Military Reservation Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near MA Military Reservation Wind Project

Questions about MA Military Reservation Wind Project

How much power does MA Military Reservation Wind Project produce?

MA Military Reservation Wind Project reported 5,057 MWh (5.06 GWh) of net generation in 2025, a 12.8% capacity factor on 4.5 MW of nameplate capacity.

Where is MA Military Reservation Wind Project?

MA Military Reservation Wind Project is in Barnstable County, Massachusetts, at 41.6647, −70.5942. It is in the ISO New England Inc. balancing area (ISNE).

Who operates MA Military Reservation Wind Project?

EIA-860M for August 2026 lists Air Force Civil Engineer Center as the operator (EIA operator ID 56619). The operator is not always the owner.

When did MA Military Reservation Wind Project start operating?

Its first generator began operating in December 2009, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page