Cedar Point Wind
Wind power plant in Lincoln County, Colorado. 252 MW of nameplate capacity across 1 generator, operated by Cedar Point LLC.
Also known as Cedar Point Wind Farm · Cedar Point · EIA plant 57315
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 252 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- May 2011First generator online
- Operator
- Cedar Point LLCEIA operator ID 56662
- Grid
- PSCOBalancing authority PSCO
- Price nodes
- None linkedNo verified ISO node
- Location
- Lincoln County, CO39.4218, −103.6781
- EIA plant ID
- 57315EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Cedar Point Wind produces
Free · EIA-923Net generation, 2025
693 GWh
692,569 MWh, final
Capacity factor, 2025
31.4%
2024: 30.3%
January to July 2026
367 GWh
Provisional
Range, 2015 to 2025
494.7–743.7
GWh a year. Low 2022, high 2017
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 316,018 | Not reported | 8 of 12 |
| 2012 | 867,709 | 39.2% | 12 of 12 |
| 2013 | 757,472 | 34.3% | 12 of 12 |
| 2014 | 764,234 | 34.6% | 12 of 12 |
| 2015 | 645,035 | 29.2% | 12 of 12 |
| 2016 | 661,318 | 29.9% | 12 of 12 |
| 2017 | 743,686 | 33.7% | 12 of 12 |
| 2018 | 726,656 | 32.9% | 12 of 12 |
| 2019 | 589,976 | 26.7% | 12 of 12 |
| 2020 | 710,181 | 32.1% | 12 of 12 |
| 2021 | 495,999 | 22.5% | 12 of 12 |
| 2022 | 494,740 | 22.4% | 12 of 12 |
| 2023 | 589,652 | 26.7% | 12 of 12 |
| 2024 | 670,507 | 30.3% | 12 of 12 |
| 2025 | 692,569 | 31.4% | 12 of 12 |
| 2026 (provisional, partial year) | 366,559 | 28.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1-139 | Onshore Wind Turbine | 252.0 | May 2011 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cedar Point LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Cedar Point Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Cedar Point Wind
Questions about Cedar Point Wind
How much power does Cedar Point Wind produce?
Cedar Point Wind reported 692,569 MWh (693 GWh) of net generation in 2025, a 31.4% capacity factor on 252 MW of nameplate capacity. From January to July 2026 it reported 367 GWh, which is provisional.
Where is Cedar Point Wind?
Cedar Point Wind is in Lincoln County, Colorado, at 39.4218, −103.6781. It is in the Public Service Company of Colorado balancing area (PSCO).
Who operates Cedar Point Wind?
EIA-860M for August 2026 lists Cedar Point LLC as the operator (EIA operator ID 56662). The operator is not always the owner.
When did Cedar Point Wind start operating?
Its first generator began operating in May 2011, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page