Thermo No 1
Geothermal power plant in Beaver County, Utah. 14 MW of nameplate capacity across 1 generator, operated by Thermo No 1 BE 01 LLC.
Also known as Thermo Geothermal Power Plant · EIA plant 57353
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 14 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2013First generator online
- Operator
- Thermo No 1 BE 01 LLCEIA operator ID 56694
- Grid
- PACEBalancing authority PACE
- Price nodes
- None linkedNo verified ISO node
- Location
- Beaver County, UT38.1607, −113.1945
- EIA plant ID
- 57353EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Thermo No 1 produces
Free · EIA-923Net generation, 2025
56.3 GWh
56,329 MWh, final
Capacity factor, 2025
45.9%
2024: 46.9%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
54.6–65.6
GWh a year. Low 2022, high 2019
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | 2,591 | 2.1% | 12 of 12 |
| 2011 | 52,108 | 42.5% | 12 of 12 |
| 2012 | 66,096 | 53.7% | 12 of 12 |
| 2013 | 52,564 | Not reported | 12 of 12 |
| 2014 | 81,479 | 66.4% | 12 of 12 |
| 2015 | 63,981 | 52.2% | 12 of 12 |
| 2016 | 63,332 | 51.5% | 12 of 12 |
| 2017 | 63,775 | 52.0% | 12 of 12 |
| 2018 | 64,926 | 52.9% | 12 of 12 |
| 2019 | 65,612 | 53.5% | 12 of 12 |
| 2020 | 61,393 | 49.9% | 12 of 12 |
| 2021 | 58,458 | 47.7% | 12 of 12 |
| 2022 | 54,570 | 44.5% | 12 of 12 |
| 2023 | 54,791 | 44.7% | 12 of 12 |
| 2024 | 57,730 | 46.9% | 12 of 12 |
| 2025 | 56,329 | 45.9% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 2 | Geothermal | 14.0 | April 2013 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Thermo No 1 BE 01 LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Thermo No 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Thermo No 1
Questions about Thermo No 1
How much power does Thermo No 1 produce?
Thermo No 1 reported 56,329 MWh (56.3 GWh) of net generation in 2025, a 45.9% capacity factor on 14 MW of nameplate capacity.
Where is Thermo No 1?
Thermo No 1 is in Beaver County, Utah, at 38.1607, −113.1945. It is in the PacifiCorp - East balancing area (PACE).
Who operates Thermo No 1?
EIA-860M for August 2026 lists Thermo No 1 BE 01 LLC as the operator (EIA operator ID 56694). The operator is not always the owner.
When did Thermo No 1 start operating?
Its first generator began operating in April 2013, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page