OilOperatingDUK

Long Creek Waste Water Plant

Oil power plant in Gaston County, North Carolina. 5.1 MW of nameplate capacity across 3 generators, operated by City of Gastonia - (NC).

Also known as Long Creek Waste Water Peaking Plant · EIA plant 57630

Analyst: free account, 1 question a day.

Auten Road Farm, LLCGaston Solar Power PlantGaston Memorial HospitalGastonia Prime Power…Gastonia, Tulip DriveMariposa Solar Center LLCLong Creek Waste Water Plant2 km
Open in the map
6 plants within 8.5 km, from EIA coordinates.

Key facts

Capacity
5.1 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
January 1995First generator online
Operator
City of Gastonia - (NC)EIA operator ID 56960
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Gaston County, NC35.3119, −81.1414
EIA plant ID
57630EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Long Creek Waste Water Plant produces

Free · EIA-923

Net generation, 2025

408 MWh

408 MWh, final

Capacity factor, 2025

0.9%

2024: 0.9%

January to July 2026

159 MWh

Provisional

Range, 2015 to 2025

192.0–408.0

MWh a year. Low 2022, high 2025

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20112740.6%12 of 12
20121490.3%12 of 12
20131910.4%12 of 12
20142720.6%12 of 12
20152480.6%12 of 12
20162330.5%12 of 12
20172820.6%12 of 12
20182280.5%12 of 12
20192760.6%12 of 12
20202700.6%12 of 12
20212850.6%12 of 12
20221920.4%12 of 12
20232350.5%12 of 12
20244020.9%12 of 12
20254080.9%12 of 12
2026 (provisional, partial year)1590.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ES1Petroleum Liquids1.7January 1995
ES2Petroleum Liquids1.7January 1995
ES3Petroleum Liquids1.7January 1995

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Gastonia - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Long Creek Waste Water Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Long Creek Waste Water Plant

More plants operated by City of Gastonia - (NC)

Questions about Long Creek Waste Water Plant

How much power does Long Creek Waste Water Plant produce?

Long Creek Waste Water Plant reported 408 MWh (408 MWh) of net generation in 2025, a 0.9% capacity factor on 5.1 MW of nameplate capacity. From January to July 2026 it reported 159 MWh, which is provisional.

Where is Long Creek Waste Water Plant?

Long Creek Waste Water Plant is in Gaston County, North Carolina, at 35.3119, −81.1414. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates Long Creek Waste Water Plant?

EIA-860M for August 2026 lists City of Gastonia - (NC) as the operator (EIA operator ID 56960). The operator is not always the owner.

When did Long Creek Waste Water Plant start operating?

Its first generator began operating in January 1995, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page