SolarOperatingPJM

FedEx Field Solar Facility

Solar power plant in Prince Georges County, Maryland. 2 MW of nameplate capacity across 1 generator, operated by NW Stadium Solar Plant.

Also known as Northwest Stadium Solar Facility · EIA plant 57747

Analyst: free account, 1 question a day.

Holly Spring MeadowsNCS FCPA LLCNCS Paradise LLCBenning RoadFedEx Field Solar Facility2 km
Open in the map
6 plants within 8.0 km, from EIA coordinates.

Key facts

Capacity
2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2011First generator online
Operator
NW Stadium Solar PlantEIA operator ID 67036
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Prince Georges County, MD38.9078, −76.8644
EIA plant ID
57747EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power FedEx Field Solar Facility produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–3.5

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011388Not reported12 of 12
20122,45214.0%12 of 12
20132,34213.4%12 of 12
20142,16312.3%12 of 12
20152,27413.0%12 of 12
20162,35513.4%12 of 12
20172,00411.4%12 of 12
20181,78810.2%12 of 12
20192,16712.4%12 of 12
20202,24512.8%12 of 12
20212,15812.3%12 of 12
20223,46319.8%12 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
202500.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic2.0September 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NW Stadium Solar Plant as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query FedEx Field Solar Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near FedEx Field Solar Facility

Questions about FedEx Field Solar Facility

How much power does FedEx Field Solar Facility produce?

FedEx Field Solar Facility reported 0 MWh (0 MWh) of net generation in 2025.

Where is FedEx Field Solar Facility?

FedEx Field Solar Facility is in Prince Georges County, Maryland, at 38.9078, −76.8644. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates FedEx Field Solar Facility?

EIA-860M for August 2026 lists NW Stadium Solar Plant as the operator (EIA operator ID 67036). The operator is not always the owner.

When did FedEx Field Solar Facility start operating?

Its first generator began operating in September 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page