WindOperatingERCOT

Wolf Ridge Wind

Wind power plant in Cooke County, Texas. 112.5 MW of nameplate capacity across 1 generator, operated by NextEra Wolf Ridge LLC.

Also known as Wolf Ridge · EIA plant 58080

Analyst: free account, 1 question a day.

Tyler Bluff Wind Project, LLCRegis MuensterWildcat Creek Wind Farm LLCBT Cooke Solar, LLCCompadre SolarWolf Ridge Wind20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
112.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2008First generator online
Operator
NextEra Wolf Ridge LLCEIA operator ID 57460
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Cooke County, TX33.7330, −97.4284
EIA plant ID
58080EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wolf Ridge Wind produces

Free · EIA-923

Net generation, 2025

355 GWh

354,986 MWh, final

Capacity factor, 2025

36.0%

2024: 37.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

272.0–406.3

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011462,25846.9%12 of 12
2012421,47242.7%12 of 12
2013405,13541.1%12 of 12
2014421,39442.8%12 of 12
2015374,69938.0%12 of 12
2016374,27537.9%12 of 12
2017346,54935.2%12 of 12
2018320,85232.6%12 of 12
2019322,39932.7%12 of 12
2020272,04027.5%12 of 12
2021372,32337.8%12 of 12
2022406,27441.2%12 of 12
2023375,64238.1%12 of 12
2024374,54837.9%12 of 12
2025354,98636.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine112.5August 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NextEra Wolf Ridge LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wolf Ridge Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wolf Ridge Wind

Questions about Wolf Ridge Wind

How much power does Wolf Ridge Wind produce?

Wolf Ridge Wind reported 354,986 MWh (355 GWh) of net generation in 2025, a 36.0% capacity factor on 112.5 MW of nameplate capacity.

Where is Wolf Ridge Wind?

Wolf Ridge Wind is in Cooke County, Texas, at 33.7330, −97.4284. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Wolf Ridge Wind?

EIA-860M for August 2026 lists NextEra Wolf Ridge LLC as the operator (EIA operator ID 57460). The operator is not always the owner.

When did Wolf Ridge Wind start operating?

Its first generator began operating in August 2008, according to EIA-860M.

Does InfraMap have power prices for Wolf Ridge Wind?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Wolf Ridge Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page