Central Utility Plant at White Oak

Natural gas power plant in Montgomery County, Maryland. 52 MW of nameplate capacity across 11 generators, operated by GSA Metropolitan Service Center.

Also known as EIA plant 58207

Analyst: free account, 1 question a day.

IKEA College Park 411GWCC PV Solar FarmBrookville Smart Bus Depot Microgrid7185 13th Pl. NWMO32 (CSG)Spectrum Solar HybridCentral Utility Plant…5 km
Open in the map
6 plants within 10 km, from EIA coordinates.

Key facts

Capacity
52 MWNatural gas 47.4 · Oil 4.6
Generators
11 operatingEIA-860M, August 2026
Operating since
November 2003First generator online
Operator
GSA Metropolitan Service CenterEIA operator ID 58178
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Montgomery County, MD39.0394, −76.9825
EIA plant ID
58207EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Central Utility Plant at White Oak produces

Free · EIA-923

Net generation, 2025

93.7 GWh

93,668 MWh, final

Capacity factor, 2025

19.7%

2024: 20.7%

January to July 2026

55.1 GWh

Provisional

Range, 2015 to 2025

93.7–161.3

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
201275,22137.4%12 of 12
201374,89633.9%12 of 12
201481,917Not reported11 of 12
2015161,32033.9%12 of 12
2016102,15221.4%12 of 12
2017105,93822.3%12 of 12
2018106,054Not reported12 of 12
2019105,06822.1%12 of 12
202093,17621.3%11 of 12
2021102,18021.5%12 of 12
202299,81421.0%12 of 12
202397,03920.4%12 of 12
202474,04520.7%9 of 12
202593,66819.7%12 of 12
2026 (provisional, partial year)55,14820.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
G1Natural Gas Internal Combustion Engine5.7November 2003
G3Natural Gas Fired Combustion Turbine4.3November 2003
G4Natural Gas Fired Combustion Turbine4.3April 2008
G5Natural Gas Fired Combustion Turbine4.3March 2009
G6Natural Gas Fired Combustion Turbine4.3May 2010
G7Natural Gas Fired Combined Cycle7.5February 2014
G8Natural Gas Fired Combined Cycle7.5February 2014
G9Natural Gas Fired Combined Cycle4.5February 2014
G10Petroleum Liquids2.3February 2014
G11Petroleum Liquids2.3February 2014
G12Natural Gas Fired Combined Cycle5.0February 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists GSA Metropolitan Service Center as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Central Utility Plant at White Oak and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Central Utility Plant at White Oak

Questions about Central Utility Plant at White Oak

How much power does Central Utility Plant at White Oak produce?

Central Utility Plant at White Oak reported 93,668 MWh (93.7 GWh) of net generation in 2025, a 19.7% capacity factor on 52 MW of nameplate capacity. From January to July 2026 it reported 55.1 GWh, which is provisional.

Where is Central Utility Plant at White Oak?

Central Utility Plant at White Oak is in Montgomery County, Maryland, at 39.0394, −76.9825. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Central Utility Plant at White Oak?

EIA-860M for August 2026 lists GSA Metropolitan Service Center as the operator (EIA operator ID 58178). The operator is not always the owner.

When did Central Utility Plant at White Oak start operating?

Its first generator began operating in November 2003, according to EIA-860M.

Does InfraMap have power prices for Central Utility Plant at White Oak?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Central Utility Plant at White Oak, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05