SolarOperatingNEVP

Mountain View Solar

Solar power plant in Clark County, Nevada. 20 MW of nameplate capacity across 1 generator, operated by NextEra Energy Mountain View Solar.

Also known as EIA plant 58544

Analyst: free account, 1 question a day.

Apex Solar PV Power ProjectSilverhawkApex Generating StationChuck Lenzie Generating StationHarry Allen Solar Energy LLCPlaya Solar 2Mountain View Solar2 km
Open in the map
6 plants within 5.4 km, from EIA coordinates.

Key facts

Capacity
20 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2014First generator online
Operator
NextEra Energy Mountain View SolarEIA operator ID 58515
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.3906, −114.9644
EIA plant ID
58544EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mountain View Solar produces

Free · EIA-923

Net generation, 2025

51.4 GWh

51,415 MWh, final

Capacity factor, 2025

29.3%

2024: 30.6%

January to July 2026

34.4 GWh

Provisional

Range, 2015 to 2025

51.4–55.1

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
201453,248Not reported12 of 12
201553,32630.4%12 of 12
201653,11830.2%12 of 12
201753,49630.5%12 of 12
201854,37531.0%12 of 12
201953,15430.3%12 of 12
202055,12231.4%12 of 12
202153,40430.5%12 of 12
202254,62731.2%12 of 12
202351,88229.6%12 of 12
202453,79830.6%12 of 12
202551,41529.3%12 of 12
2026 (provisional, partial year)34,37533.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic20.0January 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NextEra Energy Mountain View Solar as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mountain View Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mountain View Solar

Questions about Mountain View Solar

How much power does Mountain View Solar produce?

Mountain View Solar reported 51,415 MWh (51.4 GWh) of net generation in 2025, a 29.3% capacity factor on 20 MW of nameplate capacity. From January to July 2026 it reported 34.4 GWh, which is provisional.

Where is Mountain View Solar?

Mountain View Solar is in Clark County, Nevada, at 36.3906, −114.9644. It is in the Nevada Power Company balancing area (NEVP).

Who operates Mountain View Solar?

EIA-860M for August 2026 lists NextEra Energy Mountain View Solar as the operator (EIA operator ID 58515). The operator is not always the owner.

When did Mountain View Solar start operating?

Its first generator began operating in January 2014, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page