WindOperatingERCOT

TX Hereford Wind

Wind power plant in Deaf Smith County, Texas. 200 MW of nameplate capacity across 1 generator, operated by Boralex US Operations LLC.

Also known as Hereford Wind · Hereford 1 · EIA plant 58773

Analyst: free account, 1 question a day.

TX Jumbo Road WindAstra Wind FarmBethel Wind Farm LLCHornet Solar (TX)Mariah del NorteHart Wind20 km
Open in the map
6 plants within 43 km, from EIA coordinates.

Key facts

Capacity
200 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2014First generator online
Operator
Boralex US Operations LLCEIA operator ID 66100
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Deaf Smith County, TX34.7481, −102.1744
EIA plant ID
58773EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power TX Hereford Wind produces

Free · EIA-923

Net generation, 2025

526 GWh

526,300 MWh, final

Capacity factor, 2025

30.0%

2024: 42.6%

January to July 2026

373 GWh

Provisional

Range, 2015 to 2025

526.3–784.4

GWh a year. Low 2025, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015665,88038.0%12 of 12
2016740,38642.1%12 of 12
2017740,46242.3%12 of 12
2018784,38044.8%12 of 12
2019750,66042.8%12 of 12
2020753,02942.9%12 of 12
2021626,14735.7%12 of 12
2022759,69443.4%12 of 12
2023718,14441.0%12 of 12
2024748,90542.6%12 of 12
2025526,30030.0%12 of 12
2026 (provisional, partial year)372,73936.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Onshore Wind Turbine200.0December 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Boralex US Operations LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query TX Hereford Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near TX Hereford Wind

More plants operated by Boralex US Operations LLC

Questions about TX Hereford Wind

How much power does TX Hereford Wind produce?

TX Hereford Wind reported 526,300 MWh (526 GWh) of net generation in 2025, a 30.0% capacity factor on 200 MW of nameplate capacity. From January to July 2026 it reported 373 GWh, which is provisional.

Where is TX Hereford Wind?

TX Hereford Wind is in Deaf Smith County, Texas, at 34.7481, −102.1744. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates TX Hereford Wind?

EIA-860M for August 2026 lists Boralex US Operations LLC as the operator (EIA operator ID 66100). The operator is not always the owner.

When did TX Hereford Wind start operating?

Its first generator began operating in December 2014, according to EIA-860M.

Does InfraMap have power prices for TX Hereford Wind?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to TX Hereford Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page