Hoopeston Wind LLC
Wind power plant in Vermilion County, Illinois. 98 MW of nameplate capacity across 1 generator, operated by Hoopeston Wind LLC.
Also known as Hoopeston Wind Farm · Hoopeston Wind · EIA plant 59021
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 98 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- March 2015First generator online
- Operator
- Hoopeston Wind LLCEIA operator ID 58865
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Vermilion County, IL40.3997, −87.7992
- EIA plant ID
- 59021EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Hoopeston Wind produces
Free · EIA-923Net generation, 2025
338 GWh
337,742 MWh, final
Capacity factor, 2025
39.3%
2024: 43.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2016 to 2025
317.3–388.9
GWh a year. Low 2018, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | 277,265 | Not reported | 10 of 12 |
| 2016 | 324,822 | 37.7% | 12 of 12 |
| 2017 | 369,433 | 43.0% | 12 of 12 |
| 2018 | 317,298 | 37.0% | 12 of 12 |
| 2019 | 365,549 | 42.6% | 12 of 12 |
| 2020 | 322,378 | 37.4% | 12 of 12 |
| 2021 | 325,287 | 37.9% | 12 of 12 |
| 2022 | 388,880 | 45.3% | 12 of 12 |
| 2023 | 334,101 | 38.9% | 12 of 12 |
| 2024 | 371,250 | 43.1% | 12 of 12 |
| 2025 | 337,742 | 39.3% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| HOO1 | Onshore Wind Turbine | 98.0 | March 2015 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hoopeston Wind LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Hoopeston Wind LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Hoopeston Wind
Questions about Hoopeston Wind
How much power does Hoopeston Wind LLC produce?
Hoopeston Wind LLC reported 337,742 MWh (338 GWh) of net generation in 2025, a 39.3% capacity factor on 98 MW of nameplate capacity.
Where is Hoopeston Wind LLC?
Hoopeston Wind LLC is in Vermilion County, Illinois, at 40.3997, −87.7992. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Hoopeston Wind LLC?
EIA-860M for August 2026 lists Hoopeston Wind LLC as the operator (EIA operator ID 58865). The operator is not always the owner.
When did Hoopeston Wind LLC start operating?
Its first generator began operating in March 2015, according to EIA-860M.
Does InfraMap have power prices for Hoopeston Wind LLC?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Hoopeston Wind LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page