Landfill gasOperatingWACM

Front Range Project

Landfill gas power plant in Weld County, Colorado. 3.2 MW of nameplate capacity across 1 generator, operated by Timberline Energy LLC.

Also known as EIA plant 59143

Analyst: free account, 1 question a day.

Brighton PV Solar PlantFrederick Battery StorageSpindle Hill Energy CenterI25 Battery StorageFront Range Project5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
3.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 2011First generator online
Operator
Timberline Energy LLCEIA operator ID 58960
Grid
WACMBalancing authority WACM
Price nodes
None linkedNo verified ISO node
Location
Weld County, CO40.0294, −105.0047
EIA plant ID
59143EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Front Range Project produces

Free · EIA-923

Net generation, 2025

20.2 GWh

20,158 MWh, final

Capacity factor, 2025

71.9%

2024: 66.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

10.9–23.8

GWh a year. Low 2023, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
201324,32786.8%12 of 12
201423,52983.9%12 of 12
201522,06378.7%12 of 12
201623,78684.6%12 of 12
201722,01078.5%12 of 12
201821,52676.8%12 of 12
201920,39072.7%12 of 12
202019,96871.0%12 of 12
202117,30961.7%12 of 12
202213,41647.9%12 of 12
202310,87538.8%12 of 12
202418,63766.3%12 of 12
202520,15871.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
FR-1Landfill Gas3.2October 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Timberline Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Front Range Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Front Range Project

Questions about Front Range Project

How much power does Front Range Project produce?

Front Range Project reported 20,158 MWh (20.2 GWh) of net generation in 2025, a 71.9% capacity factor on 3.2 MW of nameplate capacity.

Where is Front Range Project?

Front Range Project is in Weld County, Colorado, at 40.0294, −105.0047. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Front Range Project?

EIA-860M for August 2026 lists Timberline Energy LLC as the operator (EIA operator ID 58960). The operator is not always the owner.

When did Front Range Project start operating?

Its first generator began operating in October 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page