Natural gasOperatingDUK

Kings Mountain Energy Center

Natural gas power plant in Cleveland County, North Carolina. 543.9 MW of nameplate capacity across 2 generators, operated by Carolina Power Partners, LLC.

Also known as EIA plant 59325

Analyst: free account, 1 question a day.

York Road Solar I, LLCBattlegroundCleveland Cnty Generating FacilityRoper Farm, LLCLux Solar, LLCKings Mountain2 km
Open in the map
6 plants within 7.4 km, from EIA coordinates.

Key facts

Capacity
543.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2018First generator online
Operator
Carolina Power Partners, LLCEIA operator ID 59123
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Cleveland County, NC35.2025, −81.3631
EIA plant ID
59325EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Kings Mountain produces

Free · EIA-923

Net generation, 2025

3.16 TWh

3,161,751 MWh, final

Capacity factor, 2025

66.4%

2024: 69.5%

January to July 2026

2.09 TWh

Provisional

Range, 2019 to 2025

2.9–3.4

TWh a year. Low 2021, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
20181,286,325Not reported8 of 12
20192,976,80962.5%12 of 12
20202,936,99161.5%12 of 12
20212,864,57060.1%12 of 12
20223,128,30165.7%12 of 12
20233,377,70270.9%12 of 12
20243,322,50269.5%12 of 12
20253,161,75166.4%12 of 12
2026 (provisional, partial year)2,086,43675.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.29M

US short tons. 2024: 1.34M

SO₂, 2025

7

US short tons

NOx, 2025

69

US short tons

CO₂ per MWh, calculated

0.41 t

About 815 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (ES-1), matched to EIA plant 59325 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

631

million gallons

Source

Muncipality

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.187

USGS SUI, HUC12 Headwaters Kings Creek

0 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
KMEC1Natural Gas Fired Combined Cycle310.2August 2018
KMEC2Natural Gas Fired Combined Cycle233.7August 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Carolina Power Partners, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Kings Mountain Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Kings Mountain

Questions about Kings Mountain

How much power does Kings Mountain Energy Center produce?

Kings Mountain Energy Center reported 3,161,751 MWh (3.16 TWh) of net generation in 2025, a 66.4% capacity factor on 543.9 MW of nameplate capacity. From January to July 2026 it reported 2.09 TWh, which is provisional.

Where is Kings Mountain Energy Center?

Kings Mountain Energy Center is in Cleveland County, North Carolina, at 35.2025, −81.3631. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates Kings Mountain Energy Center?

EIA-860M for August 2026 lists Carolina Power Partners, LLC as the operator (EIA operator ID 59123). The operator is not always the owner.

When did Kings Mountain Energy Center start operating?

Its first generator began operating in August 2018, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page