Landfill gasOperatingPJM

Blue Ridge Generating

Landfill gas power plant in Estill County, Kentucky. 1.6 MW of nameplate capacity across 1 generator, operated by North American Biofuels, LLC.

Also known as Blue Ridge Generating Facility · EIA plant 59392

Analyst: free account, 1 question a day.

Matilda Hamilton Fee…J K SmithCooperative Solar OneSR Turkey Creek, LLCParis (KY)HaeflingBlue Ridge Generating25 km
Open in the map
6 plants within 60 km, from EIA coordinates.

Key facts

Capacity
1.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2013First generator online
Operator
North American Biofuels, LLCEIA operator ID 59170
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Estill County, KY37.7411, −83.9889
EIA plant ID
59392EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Blue Ridge Generating produces

Free · EIA-923

Net generation, 2025

2.32 GWh

2,317 MWh, final

Capacity factor, 2025

16.5%

2024: 30.2%

January to July 2026

3.45 GWh

Provisional

Range, 2015 to 2025

2.3–8.1

GWh a year. Low 2023, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
20145,30737.9%12 of 12
20157,31452.2%12 of 12
20168,12657.8%12 of 12
20176,54446.7%12 of 12
20186,14743.9%12 of 12
20195,98742.7%12 of 12
20206,04943.0%12 of 12
20214,98035.5%12 of 12
20224,64736.2%11 of 12
20232,25816.1%12 of 12
20244,24630.2%12 of 12
20252,31716.5%12 of 12
2026 (provisional, partial year)3,44642.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Landfill Gas1.6November 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North American Biofuels, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Blue Ridge Generating and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Blue Ridge Generating

More plants operated by North American Biofuels, LLC

Questions about Blue Ridge Generating

How much power does Blue Ridge Generating produce?

Blue Ridge Generating reported 2,317 MWh (2.32 GWh) of net generation in 2025, a 16.5% capacity factor on 1.6 MW of nameplate capacity. From January to July 2026 it reported 3.45 GWh, which is provisional.

Where is Blue Ridge Generating?

Blue Ridge Generating is in Estill County, Kentucky, at 37.7411, −83.9889. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Blue Ridge Generating?

EIA-860M for August 2026 lists North American Biofuels, LLC as the operator (EIA operator ID 59170). The operator is not always the owner.

When did Blue Ridge Generating start operating?

Its first generator began operating in November 2013, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page