WindOperatingERCOT

Briscoe Wind Farm

Wind power plant in Briscoe County, Texas. 150 MW of nameplate capacity across 1 generator, operated by Briscoe Wind Farm, LLC.

Also known as Briscoe · EIA plant 59734

Analyst: free account, 1 question a day.

Longhorn WindSouth Plains IIWhirlwind Energy CenterSouth Plains Wind Phase IBriscoe Wind Farm25 km
Open in the map
6 plants within 42 km, from EIA coordinates.

Key facts

Capacity
150 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 2015First generator online
Operator
Briscoe Wind Farm, LLCEIA operator ID 65757
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Briscoe County, TX34.4323, −101.2372
EIA plant ID
59734EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Briscoe Wind Farm produces

Free · EIA-923

Net generation, 2025

421 GWh

420,754 MWh, final

Capacity factor, 2025

32.0%

2024: 34.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

291.7–488.2

GWh a year. Low 2021, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015122,286Not reported3 of 12
2016480,69136.5%12 of 12
2017415,37231.6%12 of 12
2018488,20937.2%12 of 12
2019366,85027.9%12 of 12
2020312,27123.7%12 of 12
2021291,69822.2%12 of 12
2022443,59533.8%12 of 12
2023414,57031.6%12 of 12
2024451,10834.2%12 of 12
2025420,75432.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BFWOnshore Wind Turbine150.0October 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Briscoe Wind Farm, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Briscoe Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Briscoe Wind Farm

Questions about Briscoe Wind Farm

How much power does Briscoe Wind Farm produce?

Briscoe Wind Farm reported 420,754 MWh (421 GWh) of net generation in 2025, a 32.0% capacity factor on 150 MW of nameplate capacity.

Where is Briscoe Wind Farm?

Briscoe Wind Farm is in Briscoe County, Texas, at 34.4323, −101.2372. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Briscoe Wind Farm?

EIA-860M for August 2026 lists Briscoe Wind Farm, LLC as the operator (EIA operator ID 65757). The operator is not always the owner.

When did Briscoe Wind Farm start operating?

Its first generator began operating in October 2015, according to EIA-860M.

Does InfraMap have power prices for Briscoe Wind Farm?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Briscoe Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page