Pleasants Power Station
Coal power plant in Pleasants County, West Virginia. 1,368 MW of nameplate capacity across 2 generators, operated by Omnis Pleasants, LLC.
Also known as EIA plant 6004
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1,368 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- April 1979First generator online
- Operator
- Omnis Pleasants, LLCEIA operator ID 65851
- Grid
- PJMBalancing authority PJM
- Price nodes
- 2 PJM nodesResource nodes with prices
- Location
- Pleasants County, WV39.3667, −81.2944
- EIA plant ID
- 6004EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Pleasants produces
Free · EIA-923Net generation, 2025
387 GWh
387,308 MWh, final
Capacity factor, 2025
3.2%
2024: 7.9%
January to July 2026
1.18 TWh
Provisional
Range, 2015 to 2025
0.4–8.1
TWh a year. Low 2025, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 7,477,304 | Not reported | 12 of 12 |
| 2001 | 7,795,978 | Not reported | 12 of 12 |
| 2002 | 7,629,209 | Not reported | 12 of 12 |
| 2003 | 7,620,111 | Not reported | 12 of 12 |
| 2004 | 6,042,881 | Not reported | 12 of 12 |
| 2005 | 8,851,063 | Not reported | 12 of 12 |
| 2006 | 8,654,920 | Not reported | 12 of 12 |
| 2007 | 7,857,732 | Not reported | 12 of 12 |
| 2008 | 1,431,709 | Not reported | 2 of 12 |
| 2009 | 1,348,713 | Not reported | 2 of 12 |
| 2010 | 8,287,674 | 69.2% | 12 of 12 |
| 2011 | 8,302,913 | 69.3% | 12 of 12 |
| 2012 | 7,981,840 | 66.4% | 12 of 12 |
| 2013 | 8,109,539 | 67.7% | 12 of 12 |
| 2014 | 8,578,386 | 71.6% | 12 of 12 |
| 2015 | 7,047,532 | 58.8% | 12 of 12 |
| 2016 | 6,893,024 | Not reported | 12 of 12 |
| 2017 | 7,807,672 | 65.2% | 12 of 12 |
| 2018 | 7,021,328 | 58.6% | 12 of 12 |
| 2019 | 4,965,173 | 41.4% | 12 of 12 |
| 2020 | 4,882,214 | 40.6% | 12 of 12 |
| 2021 | 7,582,771 | 63.3% | 12 of 12 |
| 2022 | 8,080,662 | Not reported | 12 of 12 |
| 2023 | 3,325,287 | 47.8% | 7 of 12 |
| 2024 | 955,020 | 7.9% | 12 of 12 |
| 2025 | 387,308 | 3.2% | 12 of 12 |
| 2026 (provisional, partial year) | 1,175,787 | 16.9% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2025
742,406
US short tons. 2024: 1.23M
SO₂, 2025
2,647
US short tons
NOx, 2025
777
US short tons
CO₂ per MWh, calculated
1.92 t
About 3,834 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 6004 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
252
million gallons
Consumption, 2024
189
million gallons
Source
Ohio River
Surface, Fresh. Natural-draft tower
Watershed stress
Very low/none · 0.142
USGS SUI, HUC12 Cow Creek-Ohio River
24 of 24 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Conventional Steam Coal | 684.0 | April 1979 |
| 2 | Conventional Steam Coal | 684.0 | December 1980 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Omnis Pleasants, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Pleasants Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Pleasants
Questions about Pleasants
How much power does Pleasants Power Station produce?
Pleasants Power Station reported 387,308 MWh (387 GWh) of net generation in 2025, a 3.2% capacity factor on 1,368 MW of nameplate capacity. From January to July 2026 it reported 1.18 TWh, which is provisional.
Where is Pleasants Power Station?
Pleasants Power Station is in Pleasants County, West Virginia, at 39.3667, −81.2944. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Pleasants Power Station?
EIA-860M for August 2026 lists Omnis Pleasants, LLC as the operator (EIA operator ID 65851). The operator is not always the owner.
When did Pleasants Power Station start operating?
Its first generator began operating in April 1979, according to EIA-860M.
Does InfraMap have power prices for Pleasants Power Station?
Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Pleasants Power Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page