CoalOperatingPJM

Pleasants Power Station

Coal power plant in Pleasants County, West Virginia. 1,368 MW of nameplate capacity across 2 generators, operated by Omnis Pleasants, LLC.

Also known as EIA plant 6004

Analyst: free account, 1 question a day.

Pleasants Energy LLCWashington Energy FacilityWaterford Power, LLCBelleville DamNew Martinsville Hannibal HydroPleasants25 km
Open in the map
6 plants within 50 km, from EIA coordinates.

Key facts

Capacity
1,368 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
April 1979First generator online
Operator
Omnis Pleasants, LLCEIA operator ID 65851
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Pleasants County, WV39.3667, −81.2944
EIA plant ID
6004EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Pleasants produces

Free · EIA-923

Net generation, 2025

387 GWh

387,308 MWh, final

Capacity factor, 2025

3.2%

2024: 7.9%

January to July 2026

1.18 TWh

Provisional

Range, 2015 to 2025

0.4–8.1

TWh a year. Low 2025, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20007,477,304Not reported12 of 12
20017,795,978Not reported12 of 12
20027,629,209Not reported12 of 12
20037,620,111Not reported12 of 12
20046,042,881Not reported12 of 12
20058,851,063Not reported12 of 12
20068,654,920Not reported12 of 12
20077,857,732Not reported12 of 12
20081,431,709Not reported2 of 12
20091,348,713Not reported2 of 12
20108,287,67469.2%12 of 12
20118,302,91369.3%12 of 12
20127,981,84066.4%12 of 12
20138,109,53967.7%12 of 12
20148,578,38671.6%12 of 12
20157,047,53258.8%12 of 12
20166,893,024Not reported12 of 12
20177,807,67265.2%12 of 12
20187,021,32858.6%12 of 12
20194,965,17341.4%12 of 12
20204,882,21440.6%12 of 12
20217,582,77163.3%12 of 12
20228,080,662Not reported12 of 12
20233,325,28747.8%7 of 12
2024955,0207.9%12 of 12
2025387,3083.2%12 of 12
2026 (provisional, partial year)1,175,78716.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

742,406

US short tons. 2024: 1.23M

SO₂, 2025

2,647

US short tons

NOx, 2025

777

US short tons

CO₂ per MWh, calculated

1.92 t

About 3,834 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 6004 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

252

million gallons

Consumption, 2024

189

million gallons

Source

Ohio River

Surface, Fresh. Natural-draft tower

Watershed stress

Very low/none · 0.142

USGS SUI, HUC12 Cow Creek-Ohio River

24 of 24 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal684.0April 1979
2Conventional Steam Coal684.0December 1980

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Omnis Pleasants, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Pleasants Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Pleasants

Questions about Pleasants

How much power does Pleasants Power Station produce?

Pleasants Power Station reported 387,308 MWh (387 GWh) of net generation in 2025, a 3.2% capacity factor on 1,368 MW of nameplate capacity. From January to July 2026 it reported 1.18 TWh, which is provisional.

Where is Pleasants Power Station?

Pleasants Power Station is in Pleasants County, West Virginia, at 39.3667, −81.2944. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Pleasants Power Station?

EIA-860M for August 2026 lists Omnis Pleasants, LLC as the operator (EIA operator ID 65851). The operator is not always the owner.

When did Pleasants Power Station start operating?

Its first generator began operating in April 1979, according to EIA-860M.

Does InfraMap have power prices for Pleasants Power Station?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Pleasants Power Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page