CoalOperatingPJM

Brandon Shores

Coal power plant in Anne Arundel County, Maryland. 1,370.2 MW of nameplate capacity across 2 generators, operated by Brandon Shores LLC.

Also known as Brandon Shores Generating Station · EIA plant 602

Analyst: free account, 1 question a day.

Herbert A WagnerWhite CSGAnne Arundel County Public SchoolsTHD Baltimore DCs - 5829 Project Lion2 km
Open in the map
6 plants within 6.5 km, from EIA coordinates.

Key facts

Capacity
1,370.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 1984First generator online
Operator
Brandon Shores LLCEIA operator ID 60421
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Anne Arundel County, MD39.1821, −76.5371
EIA plant ID
602EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Brandon Shores produces

Free · EIA-923

Net generation, 2025

2.33 TWh

2,326,416 MWh, final

Capacity factor, 2025

19.4%

2024: 18.0%

January to July 2026

2.16 TWh

Provisional

Range, 2016 to 2025

1.0–4.7

TWh a year. Low 2020, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20008,341,415Not reported12 of 12
20018,563,017Not reported12 of 12
20027,160,408Not reported12 of 12
20038,586,900Not reported12 of 12
20048,445,693Not reported12 of 12
20058,349,218Not reported12 of 12
20068,416,948Not reported12 of 12
20078,386,622Not reported12 of 12
20087,874,309Not reported12 of 12
20096,644,359Not reported12 of 12
2010657,30364.5%1 of 12
20115,902,97949.2%12 of 12
20124,876,79240.5%12 of 12
20134,919,69341.0%12 of 12
20144,758,98239.7%12 of 12
2015153,40515.6%1 of 12
20164,740,746Not reported12 of 12
20173,835,521Not reported12 of 12
20184,732,17139.4%12 of 12
20192,231,445Not reported12 of 12
2020951,0527.9%12 of 12
20212,470,80520.6%12 of 12
20222,084,64817.4%12 of 12
20231,035,2898.6%12 of 12
20242,168,46718.0%12 of 12
20252,326,41619.4%12 of 12
2026 (provisional, partial year)2,159,61031.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

2.77M

US short tons. 2024: 2.70M

SO₂, 2025

1,234

US short tons

NOx, 2025

1,474

US short tons

CO₂ per MWh, calculated

1.19 t

About 2,385 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 602 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,241

million gallons

Consumption, 2024

1,049

million gallons

Source

Patapsco River

Surface, Brackish. Induced-draft tower

Watershed stress

Very low/none · 0.119

USGS SUI, HUC12 Patapsco River-Frontal Chesapeake Bay

24 of 24 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal685.1May 1984
2Conventional Steam Coal685.1May 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Brandon Shores LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Brandon Shores and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Brandon Shores

Questions about Brandon Shores

How much power does Brandon Shores produce?

Brandon Shores reported 2,326,416 MWh (2.33 TWh) of net generation in 2025, a 19.4% capacity factor on 1,370.2 MW of nameplate capacity. From January to July 2026 it reported 2.16 TWh, which is provisional.

Where is Brandon Shores?

Brandon Shores is in Anne Arundel County, Maryland, at 39.1821, −76.5372. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Brandon Shores?

EIA-860M for August 2026 lists Brandon Shores LLC as the operator (EIA operator ID 60421). The operator is not always the owner.

When did Brandon Shores start operating?

Its first generator began operating in May 1984, according to EIA-860M.

Does InfraMap have power prices for Brandon Shores?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Brandon Shores, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page