WindOperatingSPP

Bluestem

Wind power plant in Beaver County, Oklahoma. 198 MW of nameplate capacity across 1 generator, operated by Bluestem Wind Energy, LLC.

Also known as Bluestem Wind Farm · EIA plant 60256

Analyst: free account, 1 question a day.

Ponderosa Wind IIBalko Wind LLCPalo Duro WindBluestem25 km
Open in the map
4 plants within 50 km, from EIA coordinates.

Key facts

Capacity
198 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2016First generator online
Operator
Bluestem Wind Energy, LLCEIA operator ID 60044
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Beaver County, OK36.5522, −100.5876
EIA plant ID
60256EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bluestem produces

Free · EIA-923

Net generation, 2025

759 GWh

758,986 MWh, final

Capacity factor, 2025

43.8%

2024: 46.9%

January to July 2026

488 GWh

Provisional

Range, 2017 to 2025

750.3–837.8

GWh a year. Low 2023, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201613,474Not reported1 of 12
2017794,18345.8%12 of 12
2018837,77548.3%12 of 12
2019814,18646.9%12 of 12
2020811,87646.7%12 of 12
2021809,58246.7%12 of 12
2022812,18646.8%12 of 12
2023750,27743.3%12 of 12
2024814,84046.9%12 of 12
2025758,98643.8%12 of 12
2026 (provisional, partial year)487,96348.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine198.0December 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bluestem Wind Energy, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bluestem and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bluestem

Questions about Bluestem

How much power does Bluestem produce?

Bluestem reported 758,986 MWh (759 GWh) of net generation in 2025, a 43.8% capacity factor on 198 MW of nameplate capacity. From January to July 2026 it reported 488 GWh, which is provisional.

Where is Bluestem?

Bluestem is in Beaver County, Oklahoma, at 36.5522, −100.5876. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Bluestem?

EIA-860M for August 2026 lists Bluestem Wind Energy, LLC as the operator (EIA operator ID 60044). The operator is not always the owner.

When did Bluestem start operating?

Its first generator began operating in December 2016, according to EIA-860M.

Does InfraMap have power prices for Bluestem?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Bluestem, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page