Canyon Wind Project, LLC
Wind power plant in Scurry County, Texas. 308.8 MW of nameplate capacity across 1 generator, operated by Canyon Wind Project, LLC.
Also known as Canyon Wind Project · Canyon Wind · EIA plant 60271
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 308.8 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- January 2024First generator online
- Operator
- Canyon Wind Project, LLCEIA operator ID 65489
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Scurry County, TX32.6311, −101.0085
- EIA plant ID
- 60271EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Canyon Wind Project produces
Free · EIA-923Net generation, 2025
1.09 TWh
1,094,127 MWh, final
Capacity factor, 2025
40.4%
2024: Not reported
January to July 2026
680 GWh
Provisional
Range, 2024 to 2025
1.0–1.1
TWh a year. Low 2024, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | 1,034,194 | Not reported | 12 of 12 |
| 2025 | 1,094,127 | 40.4% | 12 of 12 |
| 2026 (provisional, partial year) | 679,962 | 43.3% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| WT1 | Onshore Wind Turbine | 308.8 | January 2024 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Canyon Wind Project, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Canyon Wind Project, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Canyon Wind Project
Questions about Canyon Wind Project
How much power does Canyon Wind Project, LLC produce?
Canyon Wind Project, LLC reported 1,094,127 MWh (1.09 TWh) of net generation in 2025, a 40.4% capacity factor on 308.8 MW of nameplate capacity. From January to July 2026 it reported 680 GWh, which is provisional.
Where is Canyon Wind Project, LLC?
Canyon Wind Project, LLC is in Scurry County, Texas, at 32.6311, −101.0085. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Canyon Wind Project, LLC?
EIA-860M for August 2026 lists Canyon Wind Project, LLC as the operator (EIA operator ID 65489). The operator is not always the owner.
When did Canyon Wind Project, LLC start operating?
Its first generator began operating in January 2024, according to EIA-860M.
Does InfraMap have power prices for Canyon Wind Project, LLC?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Canyon Wind Project, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page