Key facts

Capacity
54.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2017First generator online
Operator
Albany Green Energy, LLCEIA operator ID 60130
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Dougherty County, GA31.5559, −84.1103
EIA plant ID
60340EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Albany Green Energy produces

Free · EIA-923

Net generation, 2025

106 GWh

106,169 MWh, final

Capacity factor, 2025

22.2%

2024: 67.9%

January to July 2026

200 GWh

Provisional

Range, 2018 to 2025

71.0–363.1

GWh a year. Low 2018, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017191,308Not reported6 of 12
201870,96914.9%12 of 12
2019308,85964.7%12 of 12
2020363,14575.9%12 of 12
2021360,63175.5%12 of 12
2022328,62368.8%12 of 12
2023254,17353.2%12 of 12
2024325,03067.9%12 of 12
2025106,16922.2%12 of 12
2026 (provisional, partial year)199,89372.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

557,871

US short tons. 2024: 808,185

SO₂, 2025

2

US short tons

NOx, 2025

137

US short tons

CO₂ per MWh, calculated

5.25 t

About 10,509 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (B0004), matched to EIA plant 60340 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Wood/Wood Waste Biomass54.5July 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Albany Green Energy, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Albany Green Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Albany Green Energy

Questions about Albany Green Energy

How much power does Albany Green Energy produce?

Albany Green Energy reported 106,169 MWh (106 GWh) of net generation in 2025, a 22.2% capacity factor on 54.5 MW of nameplate capacity. From January to July 2026 it reported 200 GWh, which is provisional.

Where is Albany Green Energy?

Albany Green Energy is in Dougherty County, Georgia, at 31.5559, −84.1103. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Albany Green Energy?

EIA-860M for August 2026 lists Albany Green Energy, LLC as the operator (EIA operator ID 60130). The operator is not always the owner.

When did Albany Green Energy start operating?

Its first generator began operating in July 2017, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page