SolarOperatingTVA

Millington Solar Farm

Solar power plant in Shelby County, Tennessee. 53 MW of nameplate capacity across 1 generator, operated by SR Millington, LLC.

Also known as EIA plant 60560

Analyst: free account, 1 question a day.

SR Innovation - NIKE PVIKEA Memphis 508Driver SolarPlum Point Energy StationMillington Solar Farm20 km
Open in the map
6 plants within 36 km, from EIA coordinates.

Key facts

Capacity
53 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2018First generator online
Operator
SR Millington, LLCEIA operator ID 60334
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Shelby County, TN35.3515, −89.8547
EIA plant ID
60560EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Millington Solar Farm produces

Free · EIA-923

Net generation, 2025

93.1 GWh

93,143 MWh, final

Capacity factor, 2025

20.1%

2024: 20.8%

January to July 2026

64.3 GWh

Provisional

Range, 2019 to 2025

93.1–113.4

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
201829Not reported1 of 12
2019104,47022.5%12 of 12
2020105,66422.7%12 of 12
2021108,28623.3%12 of 12
2022113,37724.4%12 of 12
2023103,40022.3%12 of 12
202496,76220.8%12 of 12
202593,14320.1%12 of 12
2026 (provisional, partial year)64,26923.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MILLSolar Photovoltaic53.0December 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists SR Millington, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Millington Solar Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Millington Solar Farm

Questions about Millington Solar Farm

How much power does Millington Solar Farm produce?

Millington Solar Farm reported 93,143 MWh (93.1 GWh) of net generation in 2025, a 20.1% capacity factor on 53 MW of nameplate capacity. From January to July 2026 it reported 64.3 GWh, which is provisional.

Where is Millington Solar Farm?

Millington Solar Farm is in Shelby County, Tennessee, at 35.3515, −89.8547. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Millington Solar Farm?

EIA-860M for August 2026 lists SR Millington, LLC as the operator (EIA operator ID 60334). The operator is not always the owner.

When did Millington Solar Farm start operating?

Its first generator began operating in December 2018, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page