Natural gasOperatingMISO

Westside Energy Station

Natural gas power plant in Olmsted County, Minnesota. 46.5 MW of nameplate capacity across 5 generators, operated by Rochester Public Utilities.

Also known as Westside Power Plant · EIA plant 60564

Analyst: free account, 1 question a day.

Westside SolarHwy 14 Holdco Solar CSGCascade CreekNovel Byron Solar CSGLange SolarWestside Energy Station2 km
Open in the map
6 plants within 7.1 km, from EIA coordinates.

Key facts

Capacity
46.5 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
March 2018First generator online
Operator
Rochester Public UtilitiesEIA operator ID 16181
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Olmsted County, MN44.0390, −92.5519
EIA plant ID
60564EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Westside Energy Station produces

Free · EIA-923

Net generation, 2025

56.9 GWh

56,920 MWh, final

Capacity factor, 2025

14.0%

2024: 9.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2019 to 2025

34.9–56.9

GWh a year. Low 2020, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
201860,228Not reported10 of 12
201943,64710.7%12 of 12
202034,9448.6%12 of 12
202155,54813.6%12 of 12
202252,41112.9%12 of 12
202348,39911.9%12 of 12
202437,1159.1%12 of 12
202556,92014.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WES1Natural Gas Internal Combustion Engine9.3March 2018
WES2Natural Gas Internal Combustion Engine9.3March 2018
WES3Natural Gas Internal Combustion Engine9.3March 2018
WES4Natural Gas Internal Combustion Engine9.3March 2018
WES5Natural Gas Internal Combustion Engine9.3March 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Rochester Public Utilities as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Westside Energy Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Westside Energy Station

More plants operated by Rochester Public Utilities

Questions about Westside Energy Station

How much power does Westside Energy Station produce?

Westside Energy Station reported 56,920 MWh (56.9 GWh) of net generation in 2025, a 14.0% capacity factor on 46.5 MW of nameplate capacity.

Where is Westside Energy Station?

Westside Energy Station is in Olmsted County, Minnesota, at 44.0390, −92.5519. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Westside Energy Station?

EIA-860M for August 2026 lists Rochester Public Utilities as the operator (EIA operator ID 16181). The operator is not always the owner.

When did Westside Energy Station start operating?

Its first generator began operating in March 2018, according to EIA-860M.

Does InfraMap have power prices for Westside Energy Station?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Westside Energy Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page