Natural gasOperatingPJM

Argonne National Laboratory CHP

Natural gas power plant in DuPage County, Illinois. 6.3 MW of nameplate capacity across 1 generator, operated by Argonne National Laboratory.

Also known as EIA plant 60742

Analyst: free account, 1 question a day.

IL Bolingbrook 279 Marquette DrIngredion IncorporatedFedEx Chicago Solar FacilityArgonne National Labo…10 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
6.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 2016First generator online
Operator
Argonne National LaboratoryEIA operator ID 60444
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
DuPage County, IL41.7165, −87.9706
EIA plant ID
60742EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Argonne National Laboratory CHP produces

Free · EIA-923

Net generation, 2025

40.3 GWh

40,296 MWh, final

Capacity factor, 2025

73.0%

2024: 86.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2017 to 2025

7.6–47.9

GWh a year. Low 2018, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201613,261Not reported8 of 12
201735,51464.4%12 of 12
20187,60613.8%12 of 12
201931,03356.2%12 of 12
202039,07270.6%12 of 12
202132,05158.1%12 of 12
202245,85383.1%12 of 12
202347,61686.3%12 of 12
202447,85486.5%12 of 12
202540,29673.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CHPNatural Gas Fired Combustion Turbine6.3May 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Argonne National Laboratory as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Argonne National Laboratory CHP and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Argonne National Laboratory CHP

Questions about Argonne National Laboratory CHP

How much power does Argonne National Laboratory CHP produce?

Argonne National Laboratory CHP reported 40,296 MWh (40.3 GWh) of net generation in 2025, a 73.0% capacity factor on 6.3 MW of nameplate capacity.

Where is Argonne National Laboratory CHP?

Argonne National Laboratory CHP is in DuPage County, Illinois, at 41.7165, −87.9706. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Argonne National Laboratory CHP?

EIA-860M for August 2026 lists Argonne National Laboratory as the operator (EIA operator ID 60444). The operator is not always the owner.

When did Argonne National Laboratory CHP start operating?

Its first generator began operating in May 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page