SolarOilBattery storageOperatingNA

San Fermin Solar Farm Hybrid

Solar project in Canovanas, Puerto Rico. 27.6 MW of nameplate capacity across 3 generators, operated by San Fermin Solar Farm LLC.

Also known as Parque Solar San Fermín · EIA plant 61110

This project groups San Fermin Solar Farm Hybrid (EIA 61110). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Lilly del Caribe PR01El Yunque Filtration PlantJanssen Ortho LLCMedtronic SolarSan Fermin Solar Farm Hybrid10 km
Open in the map
6 plants within 19 km, from EIA coordinates.

Key facts

Capacity
27.6 MWSolar 20.0 · Oil 4.0 · Battery storage 3.6
Generators
3 operatingEIA-860M, August 2026
Operating since
December 2015First generator online
Operator
San Fermin Solar Farm LLCEIA operator ID 60725
Grid
NABalancing authority NA
Price nodes
None linkedNo verified ISO node
Location
Canovanas, PR18.4115, −65.9045
EIA plant ID
61110EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power San Fermin Solar Farm Hybrid produces

Free · EIA-923

Net generation, 2025

7.48 GWh

7,475 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

3.00 GWh

Provisional

Range, 2017 to 2025

7.5–35.8

GWh a year. Low 2025, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
201727,723Not reported12 of 12
201810,067Not reported12 of 12
201935,771Not reported12 of 12
202033,711Not reported12 of 12
202132,018Not reported12 of 12
202221,969Not reported12 of 12
202320,941Not reported12 of 12
202412,901Not reported12 of 12
20257,475Not reported12 of 12
2026 (provisional, partial year)3,001Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BESSBatteries3.6December 2015
DSLPetroleum Liquids4.0December 2015
PVSolar Photovoltaic20.0December 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists San Fermin Solar Farm LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query San Fermin Solar Farm Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near San Fermin Solar Farm Hybrid

Questions about San Fermin Solar Farm Hybrid

How much power does San Fermin Solar Farm Hybrid produce?

San Fermin Solar Farm Hybrid reported 7,475 MWh (7.48 GWh) of net generation in 2025. From January to July 2026 it reported 3.00 GWh, which is provisional.

Where is San Fermin Solar Farm Hybrid?

San Fermin Solar Farm Hybrid is in Canovanas, Puerto Rico, at 18.4115, −65.9045.

Who operates San Fermin Solar Farm Hybrid?

EIA-860M for August 2026 lists San Fermin Solar Farm LLC as the operator (EIA operator ID 60725). The operator is not always the owner.

When did San Fermin Solar Farm Hybrid start operating?

Its first generator began operating in December 2015, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page