NuclearOperatingISO-NE

Seabrook

Nuclear power plant in Rockingham County, New Hampshire. 1,242 MW of nameplate capacity across 1 generator, operated by NextEra Energy Seabrook LLC.

Also known as Seabrook Station · EIA plant 6115

Analyst: free account, 1 question a day.

Hampton FacilityTrue NorthKearsarge Amesbury HybridBashaw Solar CSG 1, LLCSeabrook5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
1,242 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 1990First generator online
Operator
NextEra Energy Seabrook LLCEIA operator ID 6854
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Rockingham County, NH42.8992, −70.8489
EIA plant ID
6115EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Seabrook produces

Free · EIA-923

Net generation, 2025

10.9 TWh

10,910,165 MWh, final

Capacity factor, 2025

100.3%

2024: 88.7%

January to July 2026

5.31 TWh

Provisional

Range, 2015 to 2025

9.5–10.9

TWh a year. Low 2015, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20007,921,880Not reported12 of 12
20018,692,743Not reported12 of 12
20029,294,617Not reported12 of 12
20039,276,288Not reported12 of 12
200410,177,573Not reported12 of 12
20059,455,885Not reported12 of 12
20069,397,856Not reported12 of 12
200710,763,884Not reported12 of 12
20089,350,314Not reported12 of 12
20098,816,673Not reported12 of 12
201010,910,055100.3%12 of 12
20118,362,80776.9%12 of 12
20128,189,18175.1%12 of 12
201310,926,725100.4%12 of 12
201410,168,26593.5%12 of 12
20159,484,20487.2%12 of 12
201610,761,16398.6%12 of 12
20179,990,70491.8%12 of 12
201810,061,69692.5%12 of 12
201910,906,923100.2%12 of 12
20209,865,19690.4%12 of 12
20219,856,11790.6%12 of 12
202210,921,528100.4%12 of 12
20239,534,78187.6%12 of 12
20249,676,86288.7%12 of 12
202510,910,165100.3%12 of 12
2026 (provisional, partial year)5,306,77084.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

214,057

million gallons

Consumption, 2024

0

million gallons

Source

Atlantic Ocean

Surface, Saline. Once-through

Watershed stress

Very low/none · 0.126

USGS SUI, HUC12 Hampton River

12 of 12 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Nuclear1,242.0August 1990

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NextEra Energy Seabrook LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Seabrook and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Seabrook

Questions about Seabrook

How much power does Seabrook produce?

Seabrook reported 10,910,165 MWh (10.9 TWh) of net generation in 2025, a 100.3% capacity factor on 1,242 MW of nameplate capacity. From January to July 2026 it reported 5.31 TWh, which is provisional.

Where is Seabrook?

Seabrook is in Rockingham County, New Hampshire, at 42.8992, −70.8489. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Seabrook?

EIA-860M for August 2026 lists NextEra Energy Seabrook LLC as the operator (EIA operator ID 6854). The operator is not always the owner.

When did Seabrook start operating?

Its first generator began operating in August 1990, according to EIA-860M.

Does InfraMap have power prices for Seabrook?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Seabrook, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page