HydroOperatingERCOT

Amistad Dam & Power

Hydro power plant in Val Verde County, Texas. 66 MW of nameplate capacity across 2 generators, operated by International Bound & Wtr Comm.

Also known as Amistad Power Plant · EIA plant 6128

Analyst: free account, 1 question a day.

Tierra SecaRockspringsAntliaZier SolarAmistad Dam & Power25 km
Open in the map
6 plants within 49 km, from EIA coordinates.

Key facts

Capacity
66 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 1983First generator online
Operator
International Bound & Wtr CommEIA operator ID 9339
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Val Verde County, TX29.4498, −101.0601
EIA plant ID
6128EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Amistad Dam & Power produces

Free · EIA-923

Net generation, 2025

39.2 GWh

39,232 MWh, final

Capacity factor, 2025

6.8%

2024: 8.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

39.2–145.7

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200086,024Not reported12 of 12
200174,466Not reported12 of 12
200245,044Not reported12 of 12
200331,072Not reported12 of 12
20042,153Not reported12 of 12
2005107,600Not reported12 of 12
200690,049Not reported12 of 12
2007148,406Not reported12 of 12
2008167,726Not reported12 of 12
200983,164Not reported12 of 12
2010147,00025.4%12 of 12
201178,69213.6%12 of 12
2012166,91028.8%12 of 12
201385,91914.9%12 of 12
201474,64212.9%12 of 12
201548,4998.4%12 of 12
201648,5808.4%12 of 12
2017145,70025.2%12 of 12
201893,36016.1%12 of 12
201996,24416.6%12 of 12
2020105,24518.2%12 of 12
202159,52110.3%12 of 12
202263,79011.0%12 of 12
202387,64215.2%12 of 12
202450,5808.7%12 of 12
202539,2326.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric33.0June 1983
2Conventional Hydroelectric33.0October 1983

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists International Bound & Wtr Comm as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Amistad Dam & Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Amistad Dam & Power

More plants operated by International Bound & Wtr Comm

Questions about Amistad Dam & Power

How much power does Amistad Dam & Power produce?

Amistad Dam & Power reported 39,232 MWh (39.2 GWh) of net generation in 2025, a 6.8% capacity factor on 66 MW of nameplate capacity.

Where is Amistad Dam & Power?

Amistad Dam & Power is in Val Verde County, Texas, at 29.4498, −101.0601. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Amistad Dam & Power?

EIA-860M for August 2026 lists International Bound & Wtr Comm as the operator (EIA operator ID 9339). The operator is not always the owner.

When did Amistad Dam & Power start operating?

Its first generator began operating in June 1983, according to EIA-860M.

Does InfraMap have power prices for Amistad Dam & Power?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Amistad Dam & Power, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page