SolarOperatingPJM

IGS Solar I - BWI5

Solar power plant in Baltimore County, Maryland. 1.1 MW of nameplate capacity across 1 generator, operated by CleanCapital Holdings.

Also known as EIA plant 61358

Analyst: free account, 1 question a day.

CPG - Duke 5300A HolabirdIGS Solar I - BWI2CPG - Duke 5900 HolabirdCPG - Duke 6000 Holab…IGS Solar I - BWI5500 m
Open in the map
6 plants within 477 m, from EIA coordinates.

Key facts

Capacity
1.1 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2016First generator online
Operator
CleanCapital HoldingsEIA operator ID 65164
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Baltimore County, MD39.2700, −76.5480
EIA plant ID
61358EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power IGS Solar I - BWI5 produces

Free · EIA-923

Net generation, 2025

698 MWh

698 MWh, final

Capacity factor, 2025

7.2%

2024: 20.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2017 to 2025

0.3–2.1

GWh a year. Low 2019, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
20160Not reported1 of 12
20171,96920.4%12 of 12
20181,76318.3%12 of 12
20193033.1%12 of 12
20202,06821.4%12 of 12
202198610.2%12 of 12
20227487.8%12 of 12
20232,08221.6%12 of 12
20241,99020.6%12 of 12
20256987.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BWI5Solar Photovoltaic1.1December 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CleanCapital Holdings as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query IGS Solar I - BWI5 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near IGS Solar I - BWI5

More plants operated by CleanCapital Holdings

Questions about IGS Solar I - BWI5

How much power does IGS Solar I - BWI5 produce?

IGS Solar I - BWI5 reported 698 MWh (698 MWh) of net generation in 2025, a 7.2% capacity factor on 1.1 MW of nameplate capacity.

Where is IGS Solar I - BWI5?

IGS Solar I - BWI5 is in Baltimore County, Maryland, at 39.2700, −76.5480. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates IGS Solar I - BWI5?

EIA-860M for August 2026 lists CleanCapital Holdings as the operator (EIA operator ID 65164). The operator is not always the owner.

When did IGS Solar I - BWI5 start operating?

Its first generator began operating in December 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page