CoalOperatingSPP

Welsh

Coal power plant in Titus County, Texas. 1,116 MW of nameplate capacity across 2 generators, operated by Southwestern Electric Power Co.

Also known as J. Robert Welsh Power Plant · EIA plant 6139

Analyst: free account, 1 question a day.

Hecate Energy Upshur Rural LLCWilkesDelilah Solar Energy LLCTalco Solar ProjectStampede Solar HybridWelsh25 km
Open in the map
6 plants within 47 km, from EIA coordinates.

Key facts

Capacity
1,116 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
March 1977First generator online
Operator
Southwestern Electric Power CoEIA operator ID 17698
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Titus County, TX33.0552, −94.8400
EIA plant ID
6139EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Welsh produces

Free · EIA-923

Net generation, 2025

4.11 TWh

4,114,516 MWh, final

Capacity factor, 2025

42.1%

2024: 43.0%

January to July 2026

1.64 TWh

Provisional

Range, 2015 to 2025

3.6–6.1

TWh a year. Low 2023, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200010,819,312Not reported12 of 12
200110,852,977Not reported12 of 12
200211,000,083Not reported12 of 12
200310,285,326Not reported12 of 12
200410,394,591Not reported12 of 12
20059,537,745Not reported12 of 12
200610,035,850Not reported12 of 12
200710,504,719Not reported12 of 12
200810,354,042Not reported12 of 12
200910,660,735Not reported12 of 12
201010,831,56173.9%12 of 12
201110,888,06574.2%12 of 12
201210,280,09969.9%12 of 12
20138,752,97459.7%12 of 12
20147,982,24054.4%12 of 12
20156,130,44041.8%12 of 12
20164,489,529Not reported12 of 12
20175,582,53057.1%12 of 12
20185,456,59055.8%12 of 12
20194,544,69446.5%12 of 12
2020167,68320.2%1 of 12
20214,328,14944.3%12 of 12
20224,229,95143.3%12 of 12
20233,579,33336.6%12 of 12
20244,218,48343.0%12 of 12
20254,114,51642.1%12 of 12
2026 (provisional, partial year)1,635,78528.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

4.99M

US short tons. 2024: 5.32M

SO₂, 2025

11,542

US short tons

NOx, 2025

4,711

US short tons

CO₂ per MWh, calculated

1.21 t

About 2,426 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 6139 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

253,225

million gallons

Consumption, 2024

1,578

million gallons

Source

Swauano Creek Reservoir

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Low · 0.386

USGS SUI, HUC12 Welsh Reservoir-Big Cypress Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal558.0March 1977
3Conventional Steam Coal558.0March 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southwestern Electric Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Welsh and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Welsh

More plants operated by Southwestern Electric Power Co

Questions about Welsh

How much power does Welsh produce?

Welsh reported 4,114,516 MWh (4.11 TWh) of net generation in 2025, a 42.1% capacity factor on 1,116 MW of nameplate capacity. From January to July 2026 it reported 1.64 TWh, which is provisional.

Where is Welsh?

Welsh is in Titus County, Texas, at 33.0552, −94.8400. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Welsh?

EIA-860M for August 2026 lists Southwestern Electric Power Co as the operator (EIA operator ID 17698). The operator is not always the owner.

When did Welsh start operating?

Its first generator began operating in March 1977, according to EIA-860M.

Does InfraMap have power prices for Welsh?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to Welsh, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page