WindOperatingSPP

Diamond Vista Wind Project, LLC

Wind power plant in Marion County, Kansas. 299.3 MW of nameplate capacity across 1 generator, operated by Enel Green Power Diamond Vista Wind Project, LLC.

Also known as Diamond Vista Wind Project · Diamond Vista · EIA plant 61789

Analyst: free account, 1 question a day.

Solomon-DS&OSunflower Energy Center, LLCMcPherson 3LindsborgHarvey CountyDiamond Vista Wind Project25 km
Open in the map
6 plants within 57 km, from EIA coordinates.

Key facts

Capacity
299.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2018First generator online
Operator
Enel Green Power Diamond Vista Wind Project, LLCEIA operator ID 61413
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Marion County, KS38.5510, −97.1930
EIA plant ID
61789EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Diamond Vista Wind Project produces

Free · EIA-923

Net generation, 2025

901 GWh

901,146 MWh, final

Capacity factor, 2025

34.4%

2024: 37.3%

January to July 2026

567 GWh

Provisional

Range, 2019 to 2025

0.9–1.2

TWh a year. Low 2025, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
20191,061,641Not reported12 of 12
20201,155,47744.0%12 of 12
20211,184,01345.2%12 of 12
20221,224,09246.7%12 of 12
20231,065,26040.6%12 of 12
2024981,74137.3%12 of 12
2025901,14634.4%12 of 12
2026 (provisional, partial year)566,90737.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
DVOnshore Wind Turbine299.3December 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Enel Green Power Diamond Vista Wind Project, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Diamond Vista Wind Project, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Diamond Vista Wind Project

Questions about Diamond Vista Wind Project

How much power does Diamond Vista Wind Project, LLC produce?

Diamond Vista Wind Project, LLC reported 901,146 MWh (901 GWh) of net generation in 2025, a 34.4% capacity factor on 299.3 MW of nameplate capacity. From January to July 2026 it reported 567 GWh, which is provisional.

Where is Diamond Vista Wind Project, LLC?

Diamond Vista Wind Project, LLC is in Marion County, Kansas, at 38.5510, −97.1930. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Diamond Vista Wind Project, LLC?

EIA-860M for August 2026 lists Enel Green Power Diamond Vista Wind Project, LLC as the operator (EIA operator ID 61413). The operator is not always the owner.

When did Diamond Vista Wind Project, LLC start operating?

Its first generator began operating in December 2018, according to EIA-860M.

Does InfraMap have power prices for Diamond Vista Wind Project, LLC?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to Diamond Vista Wind Project, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page