Victoria Port II
Natural gas power plant in Victoria County, Texas. 100 MW of nameplate capacity across 2 generators, operated by Victoria Port Power II.
Also known as Victoria Port Power II · EIA plant 61966
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 100 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- January 2022First generator online
- Operator
- Victoria Port Power IIEIA operator ID 64719
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Victoria County, TX28.6985, −96.9461
- EIA plant ID
- 61966EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Victoria Port II produces
Free · EIA-923Net generation, 2025
25.2 GWh
25,150 MWh, final
Capacity factor, 2025
2.9%
2024: 21.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2022 to 2025
25.2–185.4
GWh a year. Low 2025, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 115,062 | Not reported | 12 of 12 |
| 2023 | 114,682 | 13.1% | 12 of 12 |
| 2024 | 185,440 | 21.1% | 12 of 12 |
| 2025 | 25,150 | 2.9% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDCO₂, 2025
13,870
US short tons. 2024: 125,429
SO₂, 2025
0
US short tons
NOx, 2025
1
US short tons
CO₂ per MWh, calculated
0.55 t
About 1,103 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (CT1, CT2), matched to EIA plant 61966 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| VP2-1 | Natural Gas Fired Combustion Turbine | 50.0 | January 2022 |
| VP2-2 | Natural Gas Fired Combustion Turbine | 50.0 | January 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Victoria Port Power II as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Victoria Port II and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Victoria Port II
Questions about Victoria Port II
How much power does Victoria Port II produce?
Victoria Port II reported 25,150 MWh (25.2 GWh) of net generation in 2025, a 2.9% capacity factor on 100 MW of nameplate capacity.
Where is Victoria Port II?
Victoria Port II is in Victoria County, Texas, at 28.6985, −96.9461. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Victoria Port II?
EIA-860M for August 2026 lists Victoria Port Power II as the operator (EIA operator ID 64719). The operator is not always the owner.
When did Victoria Port II start operating?
Its first generator began operating in January 2022, according to EIA-860M.
Does InfraMap have power prices for Victoria Port II?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Victoria Port II, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page