CoalOperatingMISO

Merom

Coal power plant in Sullivan County, Indiana. 1,080 MW of nameplate capacity across 2 generators, operated by Hallador Power Company, LLC.

Also known as Merom Power Station · EIA plant 6213

Analyst: free account, 1 question a day.

Sullivan Solar, LLCFairbanks Solar Project950th Sun 2Trade Post SolarRiver Ferry Solar 1Merom10 km
Open in the map
6 plants within 23 km, from EIA coordinates.

Key facts

Capacity
1,080 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
February 1982First generator online
Operator
Hallador Power Company, LLCEIA operator ID 65239
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Sullivan County, IN39.0694, −87.5108
EIA plant ID
6213EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Merom produces

Free · EIA-923

Net generation, 2025

4.82 TWh

4,820,410 MWh, final

Capacity factor, 2025

51.0%

2024: 40.9%

January to July 2026

1.82 TWh

Provisional. 6 of 7 months reported

Range, 2015 to 2025

2.6–6.1

TWh a year. Low 2020, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,853,549Not reported12 of 12
20016,716,108Not reported12 of 12
20026,643,503Not reported12 of 12
20036,576,433Not reported12 of 12
20046,142,114Not reported12 of 12
20056,773,635Not reported12 of 12
20066,470,377Not reported12 of 12
20076,707,965Not reported12 of 12
20086,502,952Not reported12 of 12
20097,575,021Not reported12 of 12
20106,700,60670.8%12 of 12
20117,006,13374.1%12 of 12
20125,584,17158.9%12 of 12
20135,955,054Not reported12 of 12
20146,444,86968.1%12 of 12
20155,178,42854.7%12 of 12
20166,075,51164.0%12 of 12
20174,909,66251.9%12 of 12
20185,870,29862.0%12 of 12
20194,590,85048.5%12 of 12
20202,585,13527.3%12 of 12
20215,271,79855.7%12 of 12
20224,818,86650.9%12 of 12
20234,284,45545.3%12 of 12
20243,883,83740.9%12 of 12
20254,820,41051.0%12 of 12
2026 (provisional, partial year)1,822,89338.9%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

5.64M

US short tons. 2024: 4.55M

SO₂, 2025

2,713

US short tons

NOx, 2025

1,650

US short tons

CO₂ per MWh, calculated

1.17 t

About 2,340 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1SG1, 2SG1), matched to EIA plant 6213 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

134,490

million gallons

Consumption, 2024

0

million gallons

Source

Turtle Creek Reservoir

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Moderate · 0.436

USGS SUI, HUC12 Turtle Creek Lake-Turtle Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal540.0September 1983
2Conventional Steam Coal540.0February 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hallador Power Company, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Merom and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Merom

Questions about Merom

How much power does Merom produce?

Merom reported 4,820,410 MWh (4.82 TWh) of net generation in 2025, a 51.0% capacity factor on 1,080 MW of nameplate capacity. From January to July 2026 it reported 1.82 TWh, which is provisional.

Where is Merom?

Merom is in Sullivan County, Indiana, at 39.0694, −87.5108. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Merom?

EIA-860M for August 2026 lists Hallador Power Company, LLC as the operator (EIA operator ID 65239). The operator is not always the owner.

When did Merom start operating?

Its first generator began operating in February 1982, according to EIA-860M.

Does InfraMap have power prices for Merom?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Merom, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page