Crossing Trails Wind Power Project LLC.
Wind power plant in Kit Carson County, Colorado. 104 MW of nameplate capacity across 1 generator, operated by EDP Renewables North America LLC.
Also known as Crossing Trails Wind Power Project · Crossing Trails · EIA plant 62489
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 104 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2021First generator online
- Operator
- EDP Renewables North America LLCEIA operator ID 61785
- Grid
- WACMBalancing authority WACM
- Price nodes
- 1 SPP nodeResource nodes with prices
- Location
- Kit Carson County, CO39.0466, −102.8224
- EIA plant ID
- 62489EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Crossing Trails Wind Power Project LLC. produces
Free · EIA-923Net generation, 2025
394 GWh
394,202 MWh, final
Capacity factor, 2025
43.3%
2024: 46.0%
January to July 2026
225 GWh
Provisional
Range, 2021 to 2025
361.2–420.0
GWh a year. Low 2021, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | 361,213 | Not reported | 12 of 12 |
| 2022 | 419,124 | 46.0% | 12 of 12 |
| 2023 | 399,334 | 43.8% | 12 of 12 |
| 2024 | 420,001 | 46.0% | 12 of 12 |
| 2025 | 394,202 | 43.3% | 12 of 12 |
| 2026 (provisional, partial year) | 225,417 | 42.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · SPPEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 104.0 | April 2021 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EDP Renewables North America LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Crossing Trails Wind Power Project LLC. and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Crossing Trails Wind Power Project LLC.
More plants operated by EDP Renewables North America LLC
Questions about Crossing Trails Wind Power Project LLC.
How much power does Crossing Trails Wind Power Project LLC. produce?
Crossing Trails Wind Power Project LLC. reported 394,202 MWh (394 GWh) of net generation in 2025, a 43.3% capacity factor on 104 MW of nameplate capacity. From January to July 2026 it reported 225 GWh, which is provisional.
Where is Crossing Trails Wind Power Project LLC.?
Crossing Trails Wind Power Project LLC. is in Kit Carson County, Colorado, at 39.0466, −102.8224. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).
Who operates Crossing Trails Wind Power Project LLC.?
EIA-860M for August 2026 lists EDP Renewables North America LLC as the operator (EIA operator ID 61785). The operator is not always the owner.
When did Crossing Trails Wind Power Project LLC. start operating?
Its first generator began operating in April 2021, according to EIA-860M.
Does InfraMap have power prices for Crossing Trails Wind Power Project LLC.?
Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Crossing Trails Wind Power Project LLC., with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page