WindOperatingWACM

Crossing Trails Wind Power Project LLC.

Wind power plant in Kit Carson County, Colorado. 104 MW of nameplate capacity across 1 generator, operated by EDP Renewables North America LLC.

Also known as Crossing Trails Wind Power Project · Crossing Trails · EIA plant 62489

Analyst: free account, 1 question a day.

Bronco Plains Wind, LLCBronco Plains Wind II, LLCDusty Rose WindKit Carson Windpower25 km
Open in the map
5 plants within 53 km, from EIA coordinates.

Key facts

Capacity
104 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2021First generator online
Operator
EDP Renewables North America LLCEIA operator ID 61785
Grid
WACMBalancing authority WACM
Price nodes
1 SPP nodeResource nodes with prices
Location
Kit Carson County, CO39.0466, −102.8224
EIA plant ID
62489EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Crossing Trails Wind Power Project LLC. produces

Free · EIA-923

Net generation, 2025

394 GWh

394,202 MWh, final

Capacity factor, 2025

43.3%

2024: 46.0%

January to July 2026

225 GWh

Provisional

Range, 2021 to 2025

361.2–420.0

GWh a year. Low 2021, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021361,213Not reported12 of 12
2022419,12446.0%12 of 12
2023399,33443.8%12 of 12
2024420,00146.0%12 of 12
2025394,20243.3%12 of 12
2026 (provisional, partial year)225,41742.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Onshore Wind Turbine104.0April 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EDP Renewables North America LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Crossing Trails Wind Power Project LLC. and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Crossing Trails Wind Power Project LLC.

More plants operated by EDP Renewables North America LLC

Questions about Crossing Trails Wind Power Project LLC.

How much power does Crossing Trails Wind Power Project LLC. produce?

Crossing Trails Wind Power Project LLC. reported 394,202 MWh (394 GWh) of net generation in 2025, a 43.3% capacity factor on 104 MW of nameplate capacity. From January to July 2026 it reported 225 GWh, which is provisional.

Where is Crossing Trails Wind Power Project LLC.?

Crossing Trails Wind Power Project LLC. is in Kit Carson County, Colorado, at 39.0466, −102.8224. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Crossing Trails Wind Power Project LLC.?

EIA-860M for August 2026 lists EDP Renewables North America LLC as the operator (EIA operator ID 61785). The operator is not always the owner.

When did Crossing Trails Wind Power Project LLC. start operating?

Its first generator began operating in April 2021, according to EIA-860M.

Does InfraMap have power prices for Crossing Trails Wind Power Project LLC.?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Crossing Trails Wind Power Project LLC., with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page