SolarWindBattery storageOperatingSPP

Skeleton Creek Energy Center Hybrid

Solar and wind project in Garfield County, Oklahoma. 752 MW of nameplate capacity across 3 generators, operated by Skeleton Creek Energy Center.

Also known as Skeleton Creek · EIA plant 62494

This project groups Skeleton Creek Energy Center Hybrid (EIA 62494). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Maverick Wind Project, LLCBreckinridge Energy StorageSkeleton Creek Energy…25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
752 MWSolar 250.0 · Wind 250.0 · Battery storage 252.0
Generators
3 operatingEIA-860M, August 2026
Operating since
December 2020First generator online
Operator
Skeleton Creek Energy CenterEIA operator ID 62023
Grid
SPPBalancing authority SWPP
Price nodes
3 SPP nodesResource nodes with prices
Location
Garfield County, OK36.5214, −98.0344
EIA plant ID
62494EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Skeleton Creek Energy Center Hybrid produces

Free · EIA-923

Net generation, 2025

221 GWh

221,359 MWh, final. 2 of 12 months reported

Capacity factor, 2025

Not reported

2024: 44.2%

January to July 2026

1.00 TWh

Provisional

Range, 2021 to 2024

0.9–1.0

TWh a year. Low 2023, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202054,008Not reported1 of 12
20211,023,03446.7%12 of 12
20221,024,53346.8%12 of 12
2023919,04842.0%12 of 12
2024971,52644.2%12 of 12
2025221,359Not reported2 of 12
2026 (provisional, partial year)1,002,94840.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SCBATBatteries252.0December 2025
SCSOLSolar Photovoltaic250.0December 2025
SKCOnshore Wind Turbine250.0December 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Skeleton Creek Energy Center as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Skeleton Creek Energy Center Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Skeleton Creek Energy Center Hybrid

Questions about Skeleton Creek Energy Center Hybrid

How much power does Skeleton Creek Energy Center Hybrid produce?

Skeleton Creek Energy Center Hybrid reported 221,359 MWh (221 GWh) of net generation in 2025. From January to July 2026 it reported 1.00 TWh, which is provisional. 2 of 12 months were reported for 2025.

Where is Skeleton Creek Energy Center Hybrid?

Skeleton Creek Energy Center Hybrid is in Garfield County, Oklahoma, at 36.5214, −98.0344. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Skeleton Creek Energy Center Hybrid?

EIA-860M for August 2026 lists Skeleton Creek Energy Center as the operator (EIA operator ID 62023). The operator is not always the owner.

Is Skeleton Creek Energy Center Hybrid a solar or a wind plant?

Both. Solar capacity totals 250 MW and wind capacity totals 250 MW, with 252 MW of battery storage.

When did Skeleton Creek Energy Center Hybrid start operating?

Its first generator began operating in December 2020, according to EIA-860M.

Does InfraMap have power prices for Skeleton Creek Energy Center Hybrid?

Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Skeleton Creek Energy Center Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page