Skeleton Creek Energy Center Hybrid
Solar and wind project in Garfield County, Oklahoma. 752 MW of nameplate capacity across 3 generators, operated by Skeleton Creek Energy Center.
Also known as Skeleton Creek · EIA plant 62494
This project groups Skeleton Creek Energy Center Hybrid (EIA 62494). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 752 MWSolar 250.0 · Wind 250.0 · Battery storage 252.0
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- December 2020First generator online
- Operator
- Skeleton Creek Energy CenterEIA operator ID 62023
- Grid
- SPPBalancing authority SWPP
- Price nodes
- 3 SPP nodesResource nodes with prices
- Location
- Garfield County, OK36.5214, −98.0344
- EIA plant ID
- 62494EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Skeleton Creek Energy Center Hybrid produces
Free · EIA-923Net generation, 2025
221 GWh
221,359 MWh, final. 2 of 12 months reported
Capacity factor, 2025
Not reported
2024: 44.2%
January to July 2026
1.00 TWh
Provisional
Range, 2021 to 2024
0.9–1.0
TWh a year. Low 2023, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 54,008 | Not reported | 1 of 12 |
| 2021 | 1,023,034 | 46.7% | 12 of 12 |
| 2022 | 1,024,533 | 46.8% | 12 of 12 |
| 2023 | 919,048 | 42.0% | 12 of 12 |
| 2024 | 971,526 | 44.2% | 12 of 12 |
| 2025 | 221,359 | Not reported | 2 of 12 |
| 2026 (provisional, partial year) | 1,002,948 | 40.7% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · SPPEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| SCBAT | Batteries | 252.0 | December 2025 |
| SCSOL | Solar Photovoltaic | 250.0 | December 2025 |
| SKC | Onshore Wind Turbine | 250.0 | December 2020 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Skeleton Creek Energy Center as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Skeleton Creek Energy Center Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Skeleton Creek Energy Center Hybrid
Questions about Skeleton Creek Energy Center Hybrid
How much power does Skeleton Creek Energy Center Hybrid produce?
Skeleton Creek Energy Center Hybrid reported 221,359 MWh (221 GWh) of net generation in 2025. From January to July 2026 it reported 1.00 TWh, which is provisional. 2 of 12 months were reported for 2025.
Where is Skeleton Creek Energy Center Hybrid?
Skeleton Creek Energy Center Hybrid is in Garfield County, Oklahoma, at 36.5214, −98.0344. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Skeleton Creek Energy Center Hybrid?
EIA-860M for August 2026 lists Skeleton Creek Energy Center as the operator (EIA operator ID 62023). The operator is not always the owner.
Is Skeleton Creek Energy Center Hybrid a solar or a wind plant?
Both. Solar capacity totals 250 MW and wind capacity totals 250 MW, with 252 MW of battery storage.
When did Skeleton Creek Energy Center Hybrid start operating?
Its first generator began operating in December 2020, according to EIA-860M.
Does InfraMap have power prices for Skeleton Creek Energy Center Hybrid?
Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Skeleton Creek Energy Center Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page