Noland Wastewater Treatment Plant Hybrid
Solar and battery storage project in Washington County, Arkansas. 11 MW of nameplate capacity across 2 generators, operated by Today's Power, Inc..
Also known as EIA plant 62682
This project groups Noland Wastewater Treatment Plant Hybrid (EIA 62682). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 11 MWSolar 5.0 · Battery storage 6.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- July 2019First generator online
- Operator
- Today's Power, Inc.EIA operator ID 61204
- Grid
- SPPBalancing authority SWPP
- Price nodes
- None linkedNo verified ISO node
- Location
- Washington County, AR36.0823, −94.0671
- EIA plant ID
- 62682EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Noland Wastewater Treatment Plant Hybrid produces
Free · EIA-923Net generation, 2025
4.08 GWh
4,075 MWh, final
Capacity factor, 2025
10.0%
2024: 20.0%
January to July 2026
2.96 GWh
Provisional
Range, 2020 to 2025
4.1–9.1
GWh a year. Low 2025, high 2020
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | 3,055 | 17.3% | 5 of 12 |
| 2020 | 9,149 | 21.4% | 12 of 12 |
| 2021 | 9,141 | 21.4% | 12 of 12 |
| 2022 | 8,924 | 20.7% | 12 of 12 |
| 2023 | 8,381 | 19.7% | 12 of 12 |
| 2024 | 8,501 | 20.0% | 12 of 12 |
| 2025 | 4,075 | 10.0% | 12 of 12 |
| 2026 (provisional, partial year) | 2,957 | 11.9% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| FAYE1 | Solar Photovoltaic | 5.0 | July 2019 |
| FAYEB | Batteries | 6.0 | July 2019 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Today's Power, Inc. as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Noland Wastewater Treatment Plant Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Noland Wastewater Treatment Plant Hybrid
More plants operated by Today's Power, Inc.
Questions about Noland Wastewater Treatment Plant Hybrid
How much power does Noland Wastewater Treatment Plant Hybrid produce?
Noland Wastewater Treatment Plant Hybrid reported 4,075 MWh (4.08 GWh) of net generation in 2025, a 10.0% capacity factor on 11 MW of nameplate capacity. From January to July 2026 it reported 2.96 GWh, which is provisional.
Where is Noland Wastewater Treatment Plant Hybrid?
Noland Wastewater Treatment Plant Hybrid is in Washington County, Arkansas, at 36.0823, −94.0672. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Noland Wastewater Treatment Plant Hybrid?
EIA-860M for August 2026 lists Today's Power, Inc. as the operator (EIA operator ID 61204). The operator is not always the owner.
Is Noland Wastewater Treatment Plant Hybrid a solar or a battery storage plant?
Both. Solar capacity totals 5 MW and battery storage capacity totals 6 MW.
When did Noland Wastewater Treatment Plant Hybrid start operating?
Its first generator began operating in July 2019, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page