El Campo Wind
Wind power plant in Knox County, Texas. 242.8 MW of nameplate capacity across 1 generator, operated by El Campo Wind, LLC (Longroad).
Also known as El Campo · EIA plant 62765
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 242.8 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2020First generator online
- Operator
- El Campo Wind, LLC (Longroad)EIA operator ID 65905
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Knox County, TX33.7322, −99.7264
- EIA plant ID
- 62765EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power El Campo Wind produces
Free · EIA-923Net generation, 2025
840 GWh
839,702 MWh, final
Capacity factor, 2025
39.5%
2024: 36.0%
January to July 2026
532 GWh
Provisional
Range, 2021 to 2025
731.4–872.8
GWh a year. Low 2023, high 2021
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 78,358 | Not reported | 1 of 12 |
| 2021 | 872,837 | 41.0% | 12 of 12 |
| 2022 | 862,078 | 40.5% | 12 of 12 |
| 2023 | 731,425 | 34.4% | 12 of 12 |
| 2024 | 767,796 | 36.0% | 12 of 12 |
| 2025 | 839,702 | 39.5% | 12 of 12 |
| 2026 (provisional, partial year) | 532,030 | 43.1% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CAMPO | Onshore Wind Turbine | 242.8 | December 2020 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists El Campo Wind, LLC (Longroad) as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query El Campo Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near El Campo Wind
Questions about El Campo Wind
How much power does El Campo Wind produce?
El Campo Wind reported 839,702 MWh (840 GWh) of net generation in 2025, a 39.5% capacity factor on 242.8 MW of nameplate capacity. From January to July 2026 it reported 532 GWh, which is provisional.
Where is El Campo Wind?
El Campo Wind is in Knox County, Texas, at 33.7322, −99.7264. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates El Campo Wind?
EIA-860M for August 2026 lists El Campo Wind, LLC (Longroad) as the operator (EIA operator ID 65905). The operator is not always the owner.
When did El Campo Wind start operating?
Its first generator began operating in December 2020, according to EIA-860M.
Does InfraMap have power prices for El Campo Wind?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to El Campo Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page