Duus Solar, LLC
Solar power plant in Clackamas County, Oregon. 10 MW of nameplate capacity across 1 generator, operated by Cardinal Renewables.
Also known as EIA plant 63330
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 10 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- February 2020First generator online
- Operator
- Cardinal RenewablesEIA operator ID 62627
- Grid
- PGEBalancing authority PGE
- Price nodes
- None linkedNo verified ISO node
- Location
- Clackamas County, OR45.3180, −122.3310
- EIA plant ID
- 63330EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Duus Solar produces
Free · EIA-923Net generation, 2025
19.1 GWh
19,069 MWh, final
Capacity factor, 2025
21.8%
2024: 21.0%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2021 to 2025
17.1–19.6
GWh a year. Low 2022, high 2021
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 17,990 | Not reported | 11 of 12 |
| 2021 | 19,616 | 22.4% | 12 of 12 |
| 2022 | 17,111 | 19.5% | 12 of 12 |
| 2023 | 19,216 | 21.9% | 12 of 12 |
| 2024 | 18,490 | 21.0% | 12 of 12 |
| 2025 | 19,069 | 21.8% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| ORDUS | Solar Photovoltaic | 10.0 | February 2020 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cardinal Renewables as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Duus Solar, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Duus Solar
More plants operated by Cardinal Renewables
Questions about Duus Solar
How much power does Duus Solar, LLC produce?
Duus Solar, LLC reported 19,069 MWh (19.1 GWh) of net generation in 2025, a 21.8% capacity factor on 10 MW of nameplate capacity.
Where is Duus Solar, LLC?
Duus Solar, LLC is in Clackamas County, Oregon, at 45.3180, −122.3310. It is in the Portland General Electric Company balancing area (PGE).
Who operates Duus Solar, LLC?
EIA-860M for August 2026 lists Cardinal Renewables as the operator (EIA operator ID 62627). The operator is not always the owner.
When did Duus Solar, LLC start operating?
Its first generator began operating in February 2020, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page