Ocracoke Hybrid
Oil and battery storage project in Hyde County, North Carolina. 4 MW of nameplate capacity across 2 generators, operated by North Carolina El Member Corp.
Also known as Ocracoke Peaking Generator · EIA plant 6377
This project groups Ocracoke Hybrid (EIA 6377). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 4 MWOil 3.0 · Battery storage 1.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- April 1991First generator online
- Operator
- North Carolina El Member CorpEIA operator ID 13683
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Hyde County, NC35.1094, −75.9797
- EIA plant ID
- 6377EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Ocracoke Hybrid produces
Free · EIA-923Net generation, 2025
−110 MWh
−110 MWh, final
Capacity factor, 2025
0.2%
2024: -0.3%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
−177.0–146.0
MWh a year. Low 2024, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | −14 | Not reported | 12 of 12 |
| 2005 | 276 | Not reported | 12 of 12 |
| 2006 | 178 | Not reported | 12 of 12 |
| 2007 | 304 | Not reported | 12 of 12 |
| 2008 | 14 | Not reported | 12 of 12 |
| 2009 | −89 | Not reported | 12 of 12 |
| 2010 | 207 | 0.8% | 12 of 12 |
| 2011 | 152 | 0.6% | 12 of 12 |
| 2012 | −33 | -0.1% | 12 of 12 |
| 2013 | 23 | 0.1% | 12 of 12 |
| 2014 | 99 | 0.4% | 12 of 12 |
| 2015 | 72 | 0.3% | 12 of 12 |
| 2016 | −60 | -0.2% | 12 of 12 |
| 2017 | 140 | Not reported | 12 of 12 |
| 2018 | 122 | 0.5% | 12 of 12 |
| 2019 | 132 | 0.5% | 12 of 12 |
| 2020 | −31 | -0.1% | 12 of 12 |
| 2021 | −45 | -0.1% | 12 of 12 |
| 2022 | 146 | 0.6% | 12 of 12 |
| 2023 | −101 | -0.3% | 12 of 12 |
| 2024 | −177 | -0.3% | 12 of 12 |
| 2025 | −110 | 0.2% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Petroleum Liquids | 3.0 | April 1991 |
| BAT | Batteries | 1.0 | January 2017 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Carolina El Member Corp as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Ocracoke Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Ocracoke Hybrid
More plants operated by North Carolina El Member Corp
Questions about Ocracoke Hybrid
How much power does Ocracoke Hybrid produce?
Ocracoke Hybrid reported −110 MWh (−110 MWh) of net generation in 2025.
Where is Ocracoke Hybrid?
Ocracoke Hybrid is in Hyde County, North Carolina, at 35.1094, −75.9797. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Ocracoke Hybrid?
EIA-860M for August 2026 lists North Carolina El Member Corp as the operator (EIA operator ID 13683). The operator is not always the owner.
Is Ocracoke Hybrid a oil or a battery storage plant?
Both. Oil capacity totals 3 MW and battery storage capacity totals 1 MW.
When did Ocracoke Hybrid start operating?
Its first generator began operating in April 1991, according to EIA-860M.
Does InfraMap have power prices for Ocracoke Hybrid?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Ocracoke Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page