OilBattery storageOperatingPJM

Ocracoke Hybrid

Oil and battery storage project in Hyde County, North Carolina. 4 MW of nameplate capacity across 2 generators, operated by North Carolina El Member Corp.

Also known as Ocracoke Peaking Generator · EIA plant 6377

This project groups Ocracoke Hybrid (EIA 6377). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

BuxtonOcracoke Hybrid25 km
Open in the map
1 plant within 44 km, from EIA coordinates.

Key facts

Capacity
4 MWOil 3.0 · Battery storage 1.0
Generators
2 operatingEIA-860M, August 2026
Operating since
April 1991First generator online
Operator
North Carolina El Member CorpEIA operator ID 13683
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Hyde County, NC35.1094, −75.9797
EIA plant ID
6377EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ocracoke Hybrid produces

Free · EIA-923

Net generation, 2025

−110 MWh

−110 MWh, final

Capacity factor, 2025

0.2%

2024: -0.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−177.0–146.0

MWh a year. Low 2024, high 2022

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004−14Not reported12 of 12
2005276Not reported12 of 12
2006178Not reported12 of 12
2007304Not reported12 of 12
200814Not reported12 of 12
2009−89Not reported12 of 12
20102070.8%12 of 12
20111520.6%12 of 12
2012−33-0.1%12 of 12
2013230.1%12 of 12
2014990.4%12 of 12
2015720.3%12 of 12
2016−60-0.2%12 of 12
2017140Not reported12 of 12
20181220.5%12 of 12
20191320.5%12 of 12
2020−31-0.1%12 of 12
2021−45-0.1%12 of 12
20221460.6%12 of 12
2023−101-0.3%12 of 12
2024−177-0.3%12 of 12
2025−1100.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids3.0April 1991
BATBatteries1.0January 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Carolina El Member Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ocracoke Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ocracoke Hybrid

More plants operated by North Carolina El Member Corp

Questions about Ocracoke Hybrid

How much power does Ocracoke Hybrid produce?

Ocracoke Hybrid reported −110 MWh (−110 MWh) of net generation in 2025.

Where is Ocracoke Hybrid?

Ocracoke Hybrid is in Hyde County, North Carolina, at 35.1094, −75.9797. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Ocracoke Hybrid?

EIA-860M for August 2026 lists North Carolina El Member Corp as the operator (EIA operator ID 13683). The operator is not always the owner.

Is Ocracoke Hybrid a oil or a battery storage plant?

Both. Oil capacity totals 3 MW and battery storage capacity totals 1 MW.

When did Ocracoke Hybrid start operating?

Its first generator began operating in April 1991, according to EIA-860M.

Does InfraMap have power prices for Ocracoke Hybrid?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Ocracoke Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page