Ellis Solar LLC
Solar power plant in Ellis County, Texas. 80 MW of nameplate capacity across 1 generator, operated by 174 Power Global Corp..
Also known as Ellis Solar, LLC · EIA plant 63797
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 80 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- October 2023First generator online
- Operator
- 174 Power Global Corp.EIA operator ID 61222
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Ellis County, TX32.4672, −97.0543
- EIA plant ID
- 63797EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Ellis Solar produces
Free · EIA-923Net generation, 2025
165 GWh
165,050 MWh, final
Capacity factor, 2025
23.6%
2024: 21.7%
January to July 2026
99.4 GWh
Provisional
Range, 2024 to 2025
152.6–165.1
GWh a year. Low 2024, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | 15,064 | 12.9% | 2 of 12 |
| 2024 | 152,572 | 21.7% | 12 of 12 |
| 2025 | 165,050 | 23.6% | 12 of 12 |
| 2026 (provisional, partial year) | 99,363 | 24.4% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GER01 | Solar Photovoltaic | 80.0 | October 2023 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists 174 Power Global Corp. as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Ellis Solar LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Ellis Solar
Questions about Ellis Solar
How much power does Ellis Solar LLC produce?
Ellis Solar LLC reported 165,050 MWh (165 GWh) of net generation in 2025, a 23.6% capacity factor on 80 MW of nameplate capacity. From January to July 2026 it reported 99.4 GWh, which is provisional.
Where is Ellis Solar LLC?
Ellis Solar LLC is in Ellis County, Texas, at 32.4672, −97.0543. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Ellis Solar LLC?
EIA-860M for August 2026 lists 174 Power Global Corp. as the operator (EIA operator ID 61222). The operator is not always the owner.
When did Ellis Solar LLC start operating?
Its first generator began operating in October 2023, according to EIA-860M.
Does InfraMap have power prices for Ellis Solar LLC?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Ellis Solar LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page