SolarOperatingERCOT

Taygete II Energy Project

Solar power plant in Pecos County, Texas. 203.8 MW of nameplate capacity across 1 generator, operated by West Texas Solar Project II LLC.

Also known as EIA plant 64075

Analyst: free account, 1 question a day.

GomezTX7 Flat TopRodeo Ranch Energy StorageTaygete II Energy Project10 km
Open in the map
6 plants within 27 km, from EIA coordinates.

Key facts

Capacity
203.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2023First generator online
Operator
West Texas Solar Project II LLCEIA operator ID 64569
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Pecos County, TX31.1860, −103.1280
EIA plant ID
64075EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Taygete II Energy Project produces

Free · EIA-923

Net generation, 2025

456 GWh

455,787 MWh, final

Capacity factor, 2025

25.5%

2024: 28.1%

January to July 2026

260 GWh

Provisional

Range, 2023 to 2025

443.6–503.0

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023443,608Not reported12 of 12
2024503,00228.1%12 of 12
2025455,78725.5%12 of 12
2026 (provisional, partial year)260,01725.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TAYG2Solar Photovoltaic203.8July 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists West Texas Solar Project II LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Taygete II Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Taygete II Energy Project

Questions about Taygete II Energy Project

How much power does Taygete II Energy Project produce?

Taygete II Energy Project reported 455,787 MWh (456 GWh) of net generation in 2025, a 25.5% capacity factor on 203.8 MW of nameplate capacity. From January to July 2026 it reported 260 GWh, which is provisional.

Where is Taygete II Energy Project?

Taygete II Energy Project is in Pecos County, Texas, at 31.1860, −103.1280. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Taygete II Energy Project?

EIA-860M for August 2026 lists West Texas Solar Project II LLC as the operator (EIA operator ID 64569). The operator is not always the owner.

When did Taygete II Energy Project start operating?

Its first generator began operating in July 2023, according to EIA-860M.

Does InfraMap have power prices for Taygete II Energy Project?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Taygete II Energy Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page