WindOperatingERCOT

Western Trail Wind, LLC

Wind power plant in Wilbarger County, Texas. 366.6 MW of nameplate capacity across 1 generator, operated by Orsted Onshore North America.

Also known as Western Trail Wind Farm · Western Trail · EIA plant 64149

Analyst: free account, 1 question a day.

Diversion Wind Energy LLCElectra Wind FarmLockett WindfarmSeymour Hills Wind Project, LLCGreen Pastures Wind ISignal Hill Generatin…Western Trail Wind25 km
Open in the map
6 plants within 44 km, from EIA coordinates.

Key facts

Capacity
366.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2022First generator online
Operator
Orsted Onshore North AmericaEIA operator ID 63773
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Wilbarger County, TX33.8524, −99.0651
EIA plant ID
64149EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Western Trail Wind produces

Free · EIA-923

Net generation, 2025

1.13 TWh

1,130,821 MWh, final

Capacity factor, 2025

35.2%

2024: 35.6%

January to July 2026

717 GWh

Provisional

Range, 2022 to 2025

0.8–1.3

TWh a year. Low 2023, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
20221,333,058Not reported12 of 12
2023834,29526.0%12 of 12
20241,146,54135.6%12 of 12
20251,130,82135.2%12 of 12
2026 (provisional, partial year)716,88038.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WTWOnshore Wind Turbine366.6April 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Orsted Onshore North America as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Western Trail Wind, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Western Trail Wind

Questions about Western Trail Wind

How much power does Western Trail Wind, LLC produce?

Western Trail Wind, LLC reported 1,130,821 MWh (1.13 TWh) of net generation in 2025, a 35.2% capacity factor on 366.6 MW of nameplate capacity. From January to July 2026 it reported 717 GWh, which is provisional.

Where is Western Trail Wind, LLC?

Western Trail Wind, LLC is in Wilbarger County, Texas, at 33.8525, −99.0651. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Western Trail Wind, LLC?

EIA-860M for August 2026 lists Orsted Onshore North America as the operator (EIA operator ID 63773). The operator is not always the owner.

When did Western Trail Wind, LLC start operating?

Its first generator began operating in April 2022, according to EIA-860M.

Does InfraMap have power prices for Western Trail Wind, LLC?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Western Trail Wind, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page