Elara Solar

Solar power plant in Frio County, Texas. 132.4 MW of nameplate capacity across 1 generator, operated by Elara Energy Holdings, LLC.

Also known as EIA plant 64204

Analyst: free account, 1 question a day.

Morrow Lake SolarCotulla BESS 1PoteetElara Solar25 km
Open in the map
6 plants within 58 km, from EIA coordinates.

Key facts

Capacity
132.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2021First generator online
Operator
Elara Energy Holdings, LLCEIA operator ID 67624
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Frio County, TX28.8832, −99.1786
EIA plant ID
64204EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Elara Solar produces

Free · EIA-923

Net generation, 2025

266 GWh

265,557 MWh, final

Capacity factor, 2025

22.9%

2024: 21.0%

January to July 2026

148 GWh

Provisional

Range, 2022 to 2025

244.0–331.7

GWh a year. Low 2024, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
202138,488Not reported3 of 12
2022331,68628.6%12 of 12
2023300,20925.9%12 of 12
2024244,04321.0%12 of 12
2025265,55722.9%12 of 12
2026 (provisional, partial year)147,94522.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ELARASolar Photovoltaic132.4December 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Elara Energy Holdings, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Elara Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Elara Solar

Questions about Elara Solar

How much power does Elara Solar produce?

Elara Solar reported 265,557 MWh (266 GWh) of net generation in 2025, a 22.9% capacity factor on 132.4 MW of nameplate capacity. From January to July 2026 it reported 148 GWh, which is provisional.

Where is Elara Solar?

Elara Solar is in Frio County, Texas, at 28.8832, −99.1786. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Elara Solar?

EIA-860M for August 2026 lists Elara Energy Holdings, LLC as the operator (EIA operator ID 67624). The operator is not always the owner.

When did Elara Solar start operating?

Its first generator began operating in December 2021, according to EIA-860M.

Does InfraMap have power prices for Elara Solar?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Elara Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page