Georges River Energy
Wood biomass power plant in Waldo County, Maine. 10 MW of nameplate capacity across 1 generator, operated by Robbins Lumber Inc.
Also known as EIA plant 64408
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 10 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2018First generator online
- Operator
- Robbins Lumber IncEIA operator ID 16191
- Grid
- ISO-NEBalancing authority ISNE
- Price nodes
- 1 ISONE nodeResource nodes with prices
- Location
- Waldo County, ME44.3331, −69.2019
- EIA plant ID
- 64408EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Georges River Energy produces
Free · EIA-923Net generation, 2025
50.9 GWh
50,897 MWh, final
Capacity factor, 2025
58.1%
2024: 59.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2020 to 2025
35.3–52.6
GWh a year. Low 2022, high 2020
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 52,609 | Not reported | 12 of 12 |
| 2021 | 48,319 | 55.2% | 12 of 12 |
| 2022 | 35,342 | 40.3% | 12 of 12 |
| 2023 | 40,317 | 46.0% | 12 of 12 |
| 2024 | 51,885 | 59.1% | 12 of 12 |
| 2025 | 50,897 | 58.1% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ISONEEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| WEG | Wood/Wood Waste Biomass | 10.0 | December 2018 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Robbins Lumber Inc as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Georges River Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Georges River Energy
More plants operated by Robbins Lumber Inc
Questions about Georges River Energy
How much power does Georges River Energy produce?
Georges River Energy reported 50,897 MWh (50.9 GWh) of net generation in 2025, a 58.1% capacity factor on 10 MW of nameplate capacity.
Where is Georges River Energy?
Georges River Energy is in Waldo County, Maine, at 44.3331, −69.2019. It is in the ISO New England Inc. balancing area (ISNE).
Who operates Georges River Energy?
EIA-860M for August 2026 lists Robbins Lumber Inc as the operator (EIA operator ID 16191). The operator is not always the owner.
When did Georges River Energy start operating?
Its first generator began operating in December 2018, according to EIA-860M.
Does InfraMap have power prices for Georges River Energy?
Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Georges River Energy, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page