Black Rock Wind
Wind power plant in Mineral County, West Virginia. 115 MW of nameplate capacity across 1 generator, operated by Black Rock Wind Force, LLC.
Also known as Black Rock · EIA plant 64433
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 115 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- February 2022First generator online
- Operator
- Black Rock Wind Force, LLCEIA operator ID 64068
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Mineral County, WV39.3668, −79.1083
- EIA plant ID
- 64433EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Black Rock Wind produces
Free · EIA-923Net generation, 2025
396 GWh
396,403 MWh, final
Capacity factor, 2025
39.3%
2024: 33.7%
January to July 2026
241 GWh
Provisional
Range, 2023 to 2025
340.8–396.4
GWh a year. Low 2024, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 267,036 | Not reported | 11 of 12 |
| 2023 | 350,807 | 34.8% | 12 of 12 |
| 2024 | 340,832 | 33.7% | 12 of 12 |
| 2025 | 396,403 | 39.3% | 12 of 12 |
| 2026 (provisional, partial year) | 240,545 | 41.1% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| BRW | Onshore Wind Turbine | 115.0 | February 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Black Rock Wind Force, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Black Rock Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Black Rock Wind
Questions about Black Rock Wind
How much power does Black Rock Wind produce?
Black Rock Wind reported 396,403 MWh (396 GWh) of net generation in 2025, a 39.3% capacity factor on 115 MW of nameplate capacity. From January to July 2026 it reported 241 GWh, which is provisional.
Where is Black Rock Wind?
Black Rock Wind is in Mineral County, West Virginia, at 39.3668, −79.1083. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Black Rock Wind?
EIA-860M for August 2026 lists Black Rock Wind Force, LLC as the operator (EIA operator ID 64068). The operator is not always the owner.
When did Black Rock Wind start operating?
Its first generator began operating in February 2022, according to EIA-860M.
Does InfraMap have power prices for Black Rock Wind?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Black Rock Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page