SolarOperatingPJM

GE-Hitachi Solar - Morris, IL

Solar power plant in Grundy County, Illinois. 0.9 MW of nameplate capacity across 1 generator, operated by DG Illinois Solar, LLC.

Also known as EIA plant 64920

Analyst: free account, 1 question a day.

CPV Three Rivers Ener…Morris Cogeneration LLCKendall County Generation FacilityWater Lily Solar LLCGE-Hitachi Solar - Mo…5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
0.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 2020First generator online
Operator
DG Illinois Solar, LLCEIA operator ID 63505
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Grundy County, IL41.3815, −88.2724
EIA plant ID
64920EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power GE-Hitachi Solar - Morris, IL produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEHILSolar Photovoltaic0.9October 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists DG Illinois Solar, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query GE-Hitachi Solar - Morris, IL and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near GE-Hitachi Solar - Morris, IL

More plants operated by DG Illinois Solar, LLC

Questions about GE-Hitachi Solar - Morris, IL

Where is GE-Hitachi Solar - Morris, IL?

GE-Hitachi Solar - Morris, IL is in Grundy County, Illinois, at 41.3815, −88.2724. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates GE-Hitachi Solar - Morris, IL?

EIA-860M for August 2026 lists DG Illinois Solar, LLC as the operator (EIA operator ID 63505). The operator is not always the owner.

When did GE-Hitachi Solar - Morris, IL start operating?

Its first generator began operating in October 2020, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page