SolarOperatingISO-NE

Bristol Landfill Solar

Solar power plant in Bristol County, Rhode Island. 5 MW of nameplate capacity across 1 generator, operated by NuGen Capital Management.

Also known as EIA plant 65142

Analyst: free account, 1 question a day.

TPE RI WA2 SolarBlackhorse Farm Solar…Forbes Street SolarBWC Swan Pond River CSGGreen Providence Wind II, LLCBristol Landfill Solar5 km
Open in the map
6 plants within 10 km, from EIA coordinates.

Key facts

Capacity
5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
March 2024First generator online
Operator
NuGen Capital ManagementEIA operator ID 59254
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Bristol County, RI41.7276, −71.2885
EIA plant ID
65142EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bristol Landfill Solar produces

Free · EIA-923

Net generation, 2025

9.16 GWh

9,161 MWh, final

Capacity factor, 2025

20.9%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2024 to 2025

7.9–9.2

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
20247,884Not reported12 of 12
20259,16120.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BL1Solar Photovoltaic5.0March 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NuGen Capital Management as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bristol Landfill Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bristol Landfill Solar

More plants operated by NuGen Capital Management

Questions about Bristol Landfill Solar

How much power does Bristol Landfill Solar produce?

Bristol Landfill Solar reported 9,161 MWh (9.16 GWh) of net generation in 2025, a 20.9% capacity factor on 5 MW of nameplate capacity.

Where is Bristol Landfill Solar?

Bristol Landfill Solar is in Bristol County, Rhode Island, at 41.7276, −71.2885. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Bristol Landfill Solar?

EIA-860M for August 2026 lists NuGen Capital Management as the operator (EIA operator ID 59254). The operator is not always the owner.

When did Bristol Landfill Solar start operating?

Its first generator began operating in March 2024, according to EIA-860M.

Does InfraMap have power prices for Bristol Landfill Solar?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Bristol Landfill Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05