OilOperatingPSCO

Rocky Ford

Oil power plant in Otero County, Colorado. 10 MW of nameplate capacity across 5 generators, operated by Black Hills Colorado Electric, LLC.

Also known as Rocky Ford Power Plant · EIA plant 6516

Analyst: free account, 1 question a day.

BH CSG 3NSE Camber BH CSG 2, LLCLas AnimasUSS Giveback Solar LLC (CSG)Rocky Ford25 km
Open in the map
4 plants within 48 km, from EIA coordinates.

Key facts

Capacity
10 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
February 1964First generator online
Operator
Black Hills Colorado Electric, LLCEIA operator ID 56146
Grid
PSCOBalancing authority PSCO
Price nodes
None linkedNo verified ISO node
Location
Otero County, CO38.0492, −103.7136
EIA plant ID
6516EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Rocky Ford produces

Free · EIA-923

Net generation, 2025

−268 MWh

−268 MWh, final

Capacity factor, 2025

-0.3%

2024: -0.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.3–1.1

GWh a year. Low 2022, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,813Not reported12 of 12
20012,519Not reported12 of 12
2002840Not reported12 of 12
20031,105Not reported12 of 12
2004215Not reported12 of 12
20051,734Not reported12 of 12
20061,625Not reported12 of 12
20071,235Not reported12 of 12
20081,246Not reported12 of 12
20091,383Not reported12 of 12
20101,3171.5%12 of 12
20112,1212.4%12 of 12
20129641.1%12 of 12
2013−36-0.0%12 of 12
2014−216-0.2%12 of 12
2015−221-0.3%12 of 12
2016−199-0.2%12 of 12
2017−277-0.3%12 of 12
2018−167Not reported12 of 12
2019−186-0.2%12 of 12
2020−285-0.3%12 of 12
20211,0871.2%12 of 12
2022−322-0.4%12 of 12
2023−293-0.3%12 of 12
2024−195-0.2%12 of 12
2025−268-0.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
IC1APetroleum Liquids2.0February 1964
IC2Petroleum Liquids2.0June 1964
IC3Petroleum Liquids2.0June 1964
IC4Petroleum Liquids2.0June 1964
IC5Petroleum Liquids2.0June 1964

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Black Hills Colorado Electric, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Rocky Ford and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Rocky Ford

More plants operated by Black Hills Colorado Electric, LLC

Questions about Rocky Ford

How much power does Rocky Ford produce?

Rocky Ford reported −268 MWh (−268 MWh) of net generation in 2025.

Where is Rocky Ford?

Rocky Ford is in Otero County, Colorado, at 38.0492, −103.7136. It is in the Public Service Company of Colorado balancing area (PSCO).

Who operates Rocky Ford?

EIA-860M for August 2026 lists Black Hills Colorado Electric, LLC as the operator (EIA operator ID 56146). The operator is not always the owner.

When did Rocky Ford start operating?

Its first generator began operating in February 1964, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page