SolarOperatingSEC

Bell Ridge Solar

Solar power plant in Gilchrist County, Florida. 74.5 MW of nameplate capacity across 1 generator, operated by Bell Ridge Solar, LLC.

Also known as EIA plant 65519

Analyst: free account, 1 question a day.

County Line Renewable Energy CenterGilchrist County SolarHigh Springs Solar Po…TrentonTrenton Solar Power PlantSanta Fe Solar Power PlantBell Ridge Solar10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
74.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2023First generator online
Operator
Bell Ridge Solar, LLCEIA operator ID 64844
Grid
SECBalancing authority SEC
Price nodes
None linkedNo verified ISO node
Location
Gilchrist County, FL29.7187, −82.7108
EIA plant ID
65519EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bell Ridge Solar produces

Free · EIA-923

Net generation, 2025

196 GWh

195,660 MWh, final

Capacity factor, 2025

30.0%

2024: 29.0%

January to July 2026

112 GWh

Provisional

Range, 2024 to 2025

189.5–195.7

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
202360,435Not reported6 of 12
2024189,51029.0%12 of 12
2025195,66030.0%12 of 12
2026 (provisional, partial year)112,25129.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BRSSolar Photovoltaic74.5September 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bell Ridge Solar, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bell Ridge Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bell Ridge Solar

Questions about Bell Ridge Solar

How much power does Bell Ridge Solar produce?

Bell Ridge Solar reported 195,660 MWh (196 GWh) of net generation in 2025, a 30.0% capacity factor on 74.5 MW of nameplate capacity. From January to July 2026 it reported 112 GWh, which is provisional.

Where is Bell Ridge Solar?

Bell Ridge Solar is in Gilchrist County, Florida, at 29.7187, −82.7108. It is in the Seminole Electric Cooperative balancing area (SEC).

Who operates Bell Ridge Solar?

EIA-860M for August 2026 lists Bell Ridge Solar, LLC as the operator (EIA operator ID 64844). The operator is not always the owner.

When did Bell Ridge Solar start operating?

Its first generator began operating in September 2023, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page