WindOperatingPSEI

Clearwater Wind I

Wind power plant in Rosebud County, Montana. 365.5 MW of nameplate capacity across 1 generator, operated by Clearwater Energy Resources LLC.

Also known as Clearwater Wind Farm · Clearwater Energy Project 1A · EIA plant 65577

Analyst: free account, 1 question a day.

Clearwater Wind IIClearwater Wind EastClearwater Wind I10 km
Open in the map
3 plants within 29 km, from EIA coordinates.

Key facts

Capacity
365.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2022First generator online
Operator
Clearwater Energy Resources LLCEIA operator ID 64896
Grid
PSEIBalancing authority PSEI
Price nodes
None linkedNo verified ISO node
Location
Rosebud County, MT46.8177, −106.3789
EIA plant ID
65577EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Clearwater Wind I produces

Free · EIA-923

Net generation, 2025

1.33 TWh

1,328,889 MWh, final

Capacity factor, 2025

41.5%

2024: 38.4%

January to July 2026

816 GWh

Provisional

Range, 2023 to 2025

1.2–1.3

TWh a year. Low 2024, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022212,170Not reported2 of 12
20231,315,80641.1%12 of 12
20241,234,05538.4%12 of 12
20251,328,88941.5%12 of 12
2026 (provisional, partial year)816,12143.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CW1Onshore Wind Turbine365.5November 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Clearwater Energy Resources LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Clearwater Wind I and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Clearwater Wind I

Questions about Clearwater Wind I

How much power does Clearwater Wind I produce?

Clearwater Wind I reported 1,328,889 MWh (1.33 TWh) of net generation in 2025, a 41.5% capacity factor on 365.5 MW of nameplate capacity. From January to July 2026 it reported 816 GWh, which is provisional.

Where is Clearwater Wind I?

Clearwater Wind I is in Rosebud County, Montana, at 46.8177, −106.3789. It is in the Puget Sound Energy balancing area (PSEI).

Who operates Clearwater Wind I?

EIA-860M for August 2026 lists Clearwater Energy Resources LLC as the operator (EIA operator ID 64896). The operator is not always the owner.

When did Clearwater Wind I start operating?

Its first generator began operating in November 2022, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page